说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 底枢
1.
Research on Operation and Management Institution and Water Protection of the Diversion Project in the Xiaolangdi Water Conservancy Key Project;
小浪底枢纽引水工程运行管理模式及水源保护研究
2.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
3.
Restoration of damaged base-slab of spillway chute of Siping Hydroproject
寺坪水电枢纽溢洪道泄槽底板的修复
4.
A Crucial Project for Harnessing the Yellow River:Xiaolangdi Multi-purpose Dam Project
治理黄河的关键工程——小浪底水利枢纽
5.
Retrospection and consideration on the resettlement of Sanmenxia and Xiaolangdiprojects in the Yellow River
三门峡、小浪底水利枢纽移民安置的回顾与思考
6.
Study of Xiaolangdi Multipurpose Dam Project Recreational Development and Management;
小浪底水利枢纽工程旅游开发与管理研究
7.
The Study of Management System of the Xiaolangdi Multipurpose Dam Project Management Bureau;
小浪底水利枢纽建设管理局管理体制研究
8.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
9.
Ground Deformation Monitoring Technology and Its Application in Xiaolangdi Multipurpose Project;
小浪底水利枢纽外部变形监测技术研究
10.
Study of Pressure Control Methods Through Impounding Water for the Gates of the Xiaolangdi Reservoir;
小浪底水利枢纽水工闸门充水平压方式研究
11.
All-stage Investment Control of the Xiaolangdi Multipurpose Dam Project;
小浪底水利枢纽工程的全过程投资控制
12.
Hydraulic Model Tests on Bottom and Middle Outlets for Three Gorges Project
长江三峡水利枢纽底孔和深孔水力学研究
13.
Calculation and Analysis of Stability of Baseplate against Floating of Absorption Basin at Baise Water Conservancy Junctions
百色水利枢纽消力池底板抗浮稳定计算与分析
14.
Analysis on Effects of Xiaolangdi Reservoir to the Activity of Faults
小浪底水利枢纽对断层活动性的影响分析
15.
Analysis of properties and causes of deformation of the Xiaolangdi Hydro Project dam
小浪底水利枢纽大坝变形特性及成因分析
16.
Anatomic imaging features of bases of skull and atlantoepistrophic articulation and diagnostic value
颅底环枢部影像解剖学特点及诊断价值
17.
Functions of central motor structures including cerebellum, basal ganglia, and cerebral cortex considered.
运动中枢结构的功能包括小脑、基底神经节和大脑皮层。
18.
Study on Methods Used for Analyzing Adjoining Rock Stability of Underground Hydroplant in Xiaolangdi Project
对黄河小浪底水利枢纽地下厂房围岩稳定性分析方法的研究