说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 清江隔河岩水利枢纽
1)  Qingjiang hydropower project
清江隔河岩水利枢纽
1.
The slope is located in the west of vertical ship elevator in Qingjiang hydropower project.
主要介绍MS-20型锚索测力计在清江隔河岩水利枢纽左岸垂直升船机西侧高边坡加固工程中的应用情况。
2)  Geheyan project
隔河岩水利枢纽
1.
In view of complex nature condition, the main purpose of Geheyan project is electricity generation.
隔河岩水利枢纽自然条件比较复杂,枢纽任务以发电为主。
3)  Qingjiang Geheyan reservoir
清江隔河岩水库
1.
Based on the data of practical observation of tectonic deformation in the strata of Sinian-Permian period and satellite imagery interpretation, the orientations of maximum principal stress during the Cenozoic era and neotectonic movement in the area of Qingjiang Geheyan reservoir are calculated.
根据震旦一二叠纪地层中构造变形的实际观测及卫星影象解译资料,计算了清江隔河岩水库区新生代以来区域应力场的主应力方向。
4)  Jiangjian Hydro Complex
江尖水利枢纽
1.
Emulation Research and Temperature Control Measures for Construction of Mass Concrete in Jiangjian Hydro Complex;
江尖水利枢纽大体积混凝土施工仿真研究及温控措施
5)  Xiaorongjiang hydraulic complex
小溶江水利枢纽
1.
Diversion tunnel design for Xiaorongjiang hydraulic complex;
小溶江水利枢纽导流隧洞设计
2.
Dam type selection for Xiaorongjiang Hydraulic Complex
桂林市小溶江水利枢纽坝型选择
6)  the Zuojiang multi-purpose dam project
左江水利枢纽
1.
Elementary discussion on construction organization of electric power step-up substation of the Zuojiang multi-purpose dam project;
浅谈左江水利枢纽升压变电工程的施工组织
2.
Power house and sluice dam metal structure design brief introduce of the Zuojiang multi-purpose dam project;
左江水利枢纽厂房及闸坝金属结构设计简介
3.
Design and practice of the floating active trashrack of hydropower station entry of the Zuojiang multi-purpose dam project;
左江水利枢纽浮式活动拦污排设计
补充资料:长江三峡水利枢纽鸟瞰图


长江三峡水利枢纽鸟瞰图


  长江三峡水利枢纽鸟瞰图 《中国建设企业百强榜》
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条