说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 斜拉悬挑支模
1)  cable stayed cantilever form
斜拉悬挑支模
1.
The paper introduces the highest beacon tower in china today, and its structural construction technology, including mass concrete, hydraulic sliding form, lifting form, cable stayed cantilever form upgrade and the hosting method of steel structure for the room roof.
34m)的结构工程施工技术 ,包括 :大体积混凝土、液压滑模、提模、斜拉悬挑支模及指挥间屋面钢结构吊装方法。
2)  cantilever and cable-stayed
悬挑斜拉式
3)  cantilevered formwork
悬挑支模架
4)  cable stayed cantilevered roof
斜拉索悬挑屋盖
1.
We conclude that the effect of geometrical nonlinearity of cable stayed cantilevered roof should be considered when analyzing the wind induced dynamic.
用风洞实验和M on te Carlo模拟两种方法,形成某体育场屋盖面上的脉动风压场,并运用有限元软件平台ANSYS,在时域内对屋盖线性和两种非线性模型的斜拉索轴力、风激动位移和应力进行比较,得到在分析预应力斜拉索悬挑屋盖风振动力响应时应考虑几何非线性的影响及一些有参考价值的结论。
5)  inclining suspend beam
悬挑斜梁
1.
Based on construction of big inclining suspend beam in Olympic Green Tennis Center,anti-overturn capability,stability and vertical deformation of big inclining support system are demonstrated in detail,and effective technology and management measures are adopted.
结合奥林匹克网球中心大倾角悬挑斜梁施工,对大倾角支撑体系抗倾覆性、稳定性、竖向变形进行了详细的论证,并采取了有效的技术及管理措施。
6)  cantilever supporting frame
悬挑支架
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。