1) inclined truss formwork support
斜拉桁架支模
2) cable-stayed truss
斜拉桁架
1.
Analysis and fitting to nodal displacements of cable-stayed truss with triangular cross-section after applying prestressing force
斜拉桁架施加预应力后的节点位移分析与拟合
3) oblique-pulling truss bridge
斜拉式桁架
1.
Influence of nodal rigid zone on mechanics characteristic of oblique-pulling truss bridge;
节点刚域效应对斜拉式桁架桥的受力影响
4) cable-stayed steel truss
斜拉钢桁架
1.
The analysis and design method of cable-stayed steel truss, prestressed steel truss, cable hold steel truss structures are presented with the Jiuhua space & resort sport center case.
结合北京九华山庄运动中心结构工程实例给出了斜拉钢桁架、预应力钢桁架和索托钢桁架结构的分析计算和设计方法,对比了结构中索的工作机理和索的预拉力对整体结构的影响,得出了一些有益的结论可为相关的预应力钢结构选型提供参考。
5) cable-stayed truss bridge
斜拉桁架桥
1.
The cable-stayed truss bridge is a relatively novel structure which has been greatly developed in recent twenty years.
斜拉桁架桥是近20年来得到较大发展的一种新颖桥型,该桥型具有自重轻、刚度大,受力明确以及材料利用率高的优点。
6) support girder
支模桁架
补充资料:木工支模拆模安全技术操作规程
第1条 模板支撑不得使用腐朽、扭裂、劈裂的材料。顶撑要垂直,底端平整坚实,并加垫木。木楔要钉牢,并用横顺拉杆和剪刀撑拉牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
第2条 采用行架支模应严格检查,发现严重变形、螺栓松动等应及时修复。
第3条 支模应按工序进行,模板没有固定前,不得进行下道工序。禁止利用拉杆、支撑攀登上下。
第4条 支设4米以上的立柱模板,四周必须顶牢,操作时要搭设工作台,不足4米的,可使用马凳操作。
第5条 支设独立梁、柱模应设临时工作台,不得站在柱模上操作和在梁启模上行走。
第6条 拆除模板应经施工技术人员同意。操作时应按顺序分段进行,严禁猛撬、硬砸或大面积撬落和拉倒。工完前;不得留下松动和悬挂的模板,拆下的模板应及时运送到指定地点集中堆放。
第7条 拆除薄腹梁、吊车梁、行架等预制构件模板,应随拆随加顶撑支牢。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条