说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 连续弹性地基梁
1)  continuous elastic foundation ground beam
连续弹性地基梁
1.
By applying the technique of continuous elastic foundation ground beam, the problem concerned with the bearing capacity of foundation ground may be solved.
运用连续弹性地基梁技术 ,解决施工中基础地基承载力问题 ,在满足结构设计、工程质量和施工安全的前提下 ,减少不必要的大面积开挖 ,避免施工安全事故的发生和造成人力物力的浪费 ,节约了时间 ,缩短了工期。
2)  Elastic continuous beam
弹性连续梁
3)  continuous elastic double layers beam
连续弹性双层梁
1.
Using the continuous elastic double layers beam model of track structure,the forces between the sleepers and the tunnel inlay produced by the running of certain subway train were calculated.
采用施加在轨道上的一系列移动轴荷载模拟列车作用,利用轨道结构连续弹性双层梁模型,计算出某城市地铁列车运行产生的轨枕与隧道之间的作用力。
4)  Elastic support continuous beam model
弹性支撑连续梁
1.
This paper analysis the interaction model between cast-in-place concrete structure and high formwork support system,and excerpts several models:Nielsen model,Simplified method,Refine method,Elastic support continuous beam model,and so on.
对施工期钢筋混凝土结构与模板高支撑体系共同作用分析模型进行了研究,引用了几种分析模型:Nielsen 模型、简化分析模型、精化分析模型、弹性支撑连续梁模型等,分析了其优缺点。
5)  continuous beam on elastic support
弹性支承连续梁
6)  elastically supported continuous girder
弹性支座连续梁
补充资料:弹性地基梁法


弹性地基梁法
method of beam on elastic subgrade

tanxing dili Iiangfa弹性地基梁法(method of beam on elas-:ic subgrade)垂直水流方向将水闸底板截取为单宽截条并作为弹性地基上的梁进行内力计算的方法。其内力计算简图与截面法基本相同,但横向地基反力不再假定为均匀分布,而是根据地基与梁的弹性变形一致的原则进行具体的计算〔见图)。此外,弹性地基梁法还计及边荷载对地基变形的影响。因此,本方法较之倒,梁法、截面法合理,常用于大、中型水一夕一~浮托力渗透压力地基反力 ┌───┬─┬──┐ │闸墩 │1 │1 │ │ 刁 │! │l__ │ ├───┼─┼──┤ │1拿 │n │li │ └───┴─┴──┘ ┌─────┬─┬─┬───┐ │闸墩 │ │ │扮 │ │ 口 │ │ │ │ ├─────┼─┴─┼───┤ │侣一 │〔 │r,了 │ └─────┴───┴───┘ ┌───────────┬──┬────┐ │‘..~-.-.~二二~-.曰.. │T │丫 │ │ 闸墩 │! │/ │ │ 截条一 │L │ │ │ │/ │ │ └───────────┴──┴────┘ ┌──┬─┬─┐ │即 │尸│田│ └──┴─┴─┘ ┌─┬─────────┬────┬───┐ │{ │{ │灌几 │·!) │ └─┴─────────┴────┴───┘ 闸底板荷载分布闸底板的设计。具体计算方法见弹性地基上梁的计算,但由于地基的性能参数不易准确选择,什算结果也难以完全符合实际。对于复杂地基可按弹性地基上的框架决行平面或空间有限元法计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条