1) large cross beam
大横梁施工
1.
The paper presents a summary of the technology for construction of large cross beams for port works,analyses of the quality of the beams and measures to improve the construction technology.
文章总结了码头大横梁施工工艺 ,对横梁质量情况做出分析 ,并提出施工改进措施 ;总结出克服横梁扭转的措施和围囹简化计算方法 ,提出对规范中混凝土浇筑分层允许厚度的修改建议。
3) sub cross beam
下横梁施工
1.
This paper summarizes the construction technology of sub cross beam for container terminal and multifunctional port of Zhengjiang.
文章总结了镇江大港集装箱及多用途码头下横梁施工工艺、克服下横梁扭转的措施和围囹简化计算方法,对横梁质量情况做出分析,并提出施工改进措施。
4) large segmental construction of steel box girder
钢箱梁大节段施工
1.
Cangkou Navigational Channel Bridge is cable-stayed bridge with large segmental construction of steel box girder in Qingdao Bay Bridge.
针对青岛海湾大桥沧口航道斜拉桥钢箱梁大节段施工,其海上安装高度高、节段自重大及施工工期长等特点,对钢箱梁安装临时支架进行专项设计计算,对临时支架的构造细节和安装顺序进行了介绍;并采用MIDAS建立了其空间有限元模型,参照现行的桥梁设计规范,确定相关计算参数、工况和计算荷载,对支架整体结构的变形、应力和振动特性进行分析,并对十字梁的变形和局部应力等关键性问题进行了详细的阐述。
5) bridge construction
桥梁施工
1.
Approach and application cases of assembled Martial Berrt Truss in the bridge construction;
军用贝雷组合桁架在桥梁施工中的应用实例与探讨
2.
On the precautions of borehole cast-in-place concrete pile used in bridge construction;
钻孔灌注桩在桥梁施工中的应用及注意事项
3.
Analyses method about real values of stress in bridge construction survey;
桥梁施工监测应力真值分析方法
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条