1.
Engineering Technologies Research on Pre-stressed Concrete Crossbeams in Combined Bridge Piers;
组合式桥墩预应力混凝土横梁施工技术研究
2.
Design of Underlying Beam Supporting Corbels in Taizhou Yangtze River Highway Bridge
泰州长江公路大桥横梁施工支撑牛腿设计
3.
Optimizing Construction Schemes for Lower Cross Beam of Main Tower of Changshou Yangtze River Bridge in Chongqing
重庆长寿长江大桥主塔下横梁施工方案优化
4.
New Construction Technology for Cable-Stayed Bridge with High Pier and Long-Span Cross Beam 100m in Height in Mountain Area
山区高墩大跨斜拉桥百米高空下横梁施工新技术
5.
Construction Technology for Beams of Steel Box Girder and Site Assembly of the Closure Segment
钢箱梁横梁及合龙段现场拼装施工技术
6.
Research on Laterally Mechanical Behavior of Pre-Stressed Concrete Box-Girder with Construction by Stages
分段施工预应力混凝土箱梁横向受力行为研究
7.
Analysis and Construction Technology of Lower Cross Beam Pre-stressing of Main Pylon of Minpu Bridge Ⅱ
闵浦二桥主塔下横梁预应力分析及施工技术
8.
The Construction of Concrete Cable Bent Tower and Design & Computation of Crossbeam Bracing Structure of the Long-Span Bridge;
大跨径桥梁混凝土索塔施工及横梁支撑体系设计与计算
9.
Design and Construction of Supporting Truss for Upper-beam Bottom Formwork in Minpu Bridge Puxi Segment
闵浦大桥浦西段上横梁底模支撑桁架设计与施工
10.
Study on the Model Experiment of the Prestressed Concrete Skewed Box Girder with Transversely Segmental Construction
横向分段施工预应力混凝土斜箱梁的模型试验研究
11.
The main girders support I-section transverse ribs.
主梁支承着工字梁的横向肋。
12.
A transverse or horizontal piece, as of a structure or implement.
横梁结构或工具等的横向的或水平部分
13.
In order to ensure the normal operation of traffic in construction the continuous box beam's construction adopts cross beam as supporting system and Bailey member bars as abutments.
为保证在施工期间的交通正常运行,连续梁的施工特采取贝雷杆件组拼支墩和横梁作为支撑系统。
14.
horizontal beam used as a finishing piece over a door or window.
作为门或窗的完工部分的水平横梁。
15.
The cross girder center segments of the bents were field bolted.
构架横梁的中间段在工地用螺栓连接。
16.
Simulation and Optimization of Casting Technique on Upper Beam of 80MN Rapid Forging Press
80MN快锻机上横梁铸造工艺仿真与优化
17.
Investigate and Design the Adjusting Crossbeam Balance of Gantry MC
龙门式加工中心横梁调平研究与设计
18.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工