1) critical shear wave velocity
临界剪切波速
2) critical shear rate
临界剪切速率
1.
Based on the Herschel-Bulkley model,the critical shear rate is obtained by a new method.
根据Herschel-Bulkley模型,运用一种新方法确定水煤浆的临界剪切速率,结合旋转粘度计法和管流法在广范围剪切速率下得出水煤浆的真实流变方程。
3) critical shear stress
临界剪切力
4) shear wave velocity
剪切波速
1.
Study on ultrasonic shear wave velocity measuring instrument and method used for soil specimen;
土样剪切波速超声测试装置与方法研究
2.
The improvement of method of detectors next to the wall when testing shear wave velocity in the deep hole;
深孔剪切波速测试孔下探头贴壁方法的改进
3.
Utilization of shear wave velocity in assessment of liquefaction potential of saturated sand under level ground during earthquakes;
剪切波速在评估地基饱和砂层地震液化可能性中的应用
5) shear velocity
剪切波速
1.
Shear velocity is an important parameter in evaluating the dynamic properties of a site In this paper,the statistical relation of shear velocity with soil properties is obtained by statistical analysis of the values tested in Tianjin and Shanghai The obtained formula is of some referential value for the evaluation and classification of a site in the coastal and offshore areas of our countr
剪切波速是评价场地土动力特性的重要指标。
6) shear-wave velocity
剪切波速
1.
Summary on the study of liquefaction evaluation by shear-wave velocity;
应用剪切波速判别砂土液化的研究综述
2.
Application of multiple cross-correlation functions to the measurement of shear-wave velocity
多重互相关函数在剪切波速测量中的应用
3.
Through comparison measurement and analyses of shear-wave velocity in subsoil of Huaiyin Institute of Technology main-building before piling and after,the author discovers the site classification may be changed by piling.
通过对淮阴工学院主楼地基在打桩前后的场地剪切波速对比测试 ,发现打桩有改变场地类别的可能 ,建议《规范》[1] 增加对打桩建筑特别是打桩较密的高层建筑在打桩后 ,应再次进行剪切波速测试并对比场地类别的改变等内容 ,从而提高工程设计的经济效益和社会效益。
补充资料:临界剪切速率
分子式:
CAS号:
性质:聚合物在挤出成型中产生不稳定流动的剪切速率临界值,以гc表示。不稳定流动将导致挤出物表面粗糙、起伏不平、螺旋扭曲甚至熔体破裂等现象,故成型时的剪切速率必须低于гc。
CAS号:
性质:聚合物在挤出成型中产生不稳定流动的剪切速率临界值,以гc表示。不稳定流动将导致挤出物表面粗糙、起伏不平、螺旋扭曲甚至熔体破裂等现象,故成型时的剪切速率必须低于гc。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条