说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 不完整井
1)  partially penetrating well
不完整井
1.
This method is also applicable to the problems of pumping (watering) at constant or inconstant rate in fully penetrating well or partially penetrating well.
此方法可适用于完整井、不完整井的定流量或不定流量抽(注 )水问
2)  partially penetrated well
非完整井
1.
The partially penetrated well and unsteady flow theory are used to design the dewatering project, and Modflow 3-D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楼深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
2.
Based on analyzing the discharge of the partially penetrated wells in phreatic aquifer,introducing the conception of "the effective zone"of pumping,probing into the feasibility and comparative error by translating the calculation of the discharge of the partially penetrated wells into the calculation of the discharge of the equivalent completely penetrated wells.
通过对潜水含水层中的非完整井基坑涌水量计算方法的分析 ,探讨引入抽水“有效带”的概念 ,将非完整井群涌水量计算转化为等效完整井群涌水量计算方法的可行性及由此产生的相对误差大小。
3.
The partially penetrated well and unsteady flew theory are used to design the dewatering project, and Modf-low 3 - D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楱深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
3)  fully penetrating well
完整井
1.
Similarity method based on discharge in fully penetrating well;
完整井中基于流量的相似方法
2.
This method is also applicable to the problems of pumping (watering) at constant or inconstant rate in fully penetrating well or partially penetrating well.
此方法可适用于完整井、不完整井的定流量或不定流量抽(注 )水问
4)  imperfect well
不完善井
1.
Using Hill Walker s method, the exact solution to the pressure behavior is given in imperfect well in bottom water limestone oil reservoir.
利用HilWalker方法,给出了底水灰岩油藏中不完善井的压力动态问题在实时空间中的精确解。
5)  imperfect well
不完全井
6)  unwhole pile
不完整桩
1.
In this paper,we establish the computational models for unwhole piles based on the restriction of the top and the end of piles,and study the stability of the unwhole piles in the homogeneous soil under axial cycle loads.
根据桩端和桩顶的约束情况建立计算模型,对均匀土层下不完整桩在周期纵向力作用下的横向振动的稳定性进行了分析。
补充资料:白银有色金属公司深部铜矿主井和副井


白银有色金属公司深部铜矿主井和副井


白银有色金属公司深部铜矿主井和副井
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条