1) full penetrating well in non-compression aquifer
无压完整井
2) partially penetrated well
非完整井
1.
The partially penetrated well and unsteady flow theory are used to design the dewatering project, and Modflow 3-D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楼深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
2.
Based on analyzing the discharge of the partially penetrated wells in phreatic aquifer,introducing the conception of "the effective zone"of pumping,probing into the feasibility and comparative error by translating the calculation of the discharge of the partially penetrated wells into the calculation of the discharge of the equivalent completely penetrated wells.
通过对潜水含水层中的非完整井基坑涌水量计算方法的分析 ,探讨引入抽水“有效带”的概念 ,将非完整井群涌水量计算转化为等效完整井群涌水量计算方法的可行性及由此产生的相对误差大小。
3.
The partially penetrated well and unsteady flew theory are used to design the dewatering project, and Modf-low 3 - D flow Model software is used to test it at Tower Building of Shanghai Global Finance Center in the confined aquifers, of which the first, second and third confined aquifers have direct connection each to other.
上海环球金融中心塔楼区降水工程采用非完整井非稳定流理论设计,三维数值模型验证,在上海第一、二、三承压含水层相互连通的承压含水层组中采取降水手段,科学设计、精心施工和严格管理,确保了塔楱深基坑安全开挖和大底板正常施工,同时保证了周边环境的安全和稳定。
3) fully penetrating well
完整井
1.
Similarity method based on discharge in fully penetrating well;
完整井中基于流量的相似方法
2.
This method is also applicable to the problems of pumping (watering) at constant or inconstant rate in fully penetrating well or partially penetrating well.
此方法可适用于完整井、不完整井的定流量或不定流量抽(注 )水问
4) partially penetrating well
不完整井
1.
This method is also applicable to the problems of pumping (watering) at constant or inconstant rate in fully penetrating well or partially penetrating well.
此方法可适用于完整井、不完整井的定流量或不定流量抽(注 )水问
5) tubingless completion
无管完井
补充资料:反应堆冷却剂系统承压边界完整性监督
反应堆冷却剂系统承压边界完整性监督
monitoring of integrity of reactor coolant system pressure boundary
fanylngdul}engqueJ一x一tong ehengyob一onl一e wonzheng-x}ng Ilondu反应堆冷却荆系统承压边界完整性监任(monitoring of integrity of re应ctor eoolantsystem pressure boundary)反应堆冷却剂系统承压边界是三道屏障(燃料包壳、反应堆冷却剂承压边界和安全壳)的第二道屏障,包括落汽发生器一回路侧。其中蒸汽发生器传热管既是第二道屏障又局部地起第三道屏障的作用,因为一旦传热管破损,放封性将随燕汽直接进人安全壳以外的大气。在核电厂运行期间,通过安全壳厂房和相关工艺系统的放射性监测、冷却剂收集容器和琉水系统的过程量测量和报警以及反应堆冷却剂系统泄漏率侧量等手段对反应堆冷却剂系统承压边界的完整性进行有效监督。 反应堆冷却剂系统泄漏率测t分别记录两个时刻(一般取两小时的时间间隔,时间间隔越长,试验结果越精确)德压器的水位、容控箱的水位以及一回路的平均退度,通过总体积平衡法,计算出一回路的总泄漏率,用凡表示。这种试验是每天定期进行的。试验前不要使控制捧处于插人或提升极限位置,以避免试验期间作加翻或稀释的操作。试验前还要使容控箱有足够高的水位,试验期间不需要自动补水.根据每天试验的结果,对一回路的泄翻率进行趋势跟踪。 以大亚清核电厂为例,泄漏率的计算公式为Fp=34.64XN,一N,---几二一十 召吐35.23XN3一N- 山709TI一TZ 山L/h式中N:表示试验初始状态时容控箱的水位,cm;NZ表示试验终止时容控箱的水位,cm;N3表示试验初始状态时称压器的水位,cm .N;表示试验终止时稳压器的水位,。m,T,表示试脸初始状态时一回路的平均温度,C;几表示试验终止时一回路的平均温度,‘C;山-t,一t。,h;其中t。表示试验开始时刻;t、表示试验终止时刻。可识别泄漏和不可识别泄漏的监奋当泄漏通过设计措施收集并引导到已标识的容器(安全壳除外)而且流人该容器的总流量可以侧量,则此泄漏称为可识别泄漏,用凡表示;上述定义未包括的所有情况下的泄漏称为不可识别泄漏,用F、表示。 显然,总泄漏率、可识别泄漏率和不可识别泄漏率之间的关系为 Fp一F,十F, 冷却剂可识别泄漏的监仔手段主要有冷却剂的各种疏水箱和收集容器的液位指示,以及某些管道的沮度探头的报警装里.例如稳压器安全阀的泄翻可通过安全阀上游管线的高温报誉和稳压器卸压箱水位增加来判断,并通过水位的变化计算泄汤量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条