说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工料估算
1)  material consumption estimating
工料估算
2)  human-hour estimating
工时估算
1.
Research on human-hour estimating of NC machining parts using neural network;
数控加工零件工时估算的神经网络方法研究
3)  engineering estimation
工程估算
1.
Engineering estimation for mean temperature and rupturing time of rotating cylinder shell irradiated by laser beams;
激光辐照下转动柱壳平均温度与破坏时间的工程估算
2.
Missile Datcom software,which was developed by the United States Air Force(USAF) for engineering estimation of the missile aerodynamic force,is practical at the design stage of aircraft.
结果表明,该软件在一定范围内能提供较高精度的气动力系数估算结果,对不同导弹气动力外形具有较强的适用性,为国内气动力工程估算提供了一套通用工具。
3.
A simple engineering estimation method derived from classical sound transmission theory was established.
本文从经典的声波透射理论出发,建立了一种较简单的空气噪声传递产生水下噪声的工程估算方法,其中壳板的声压透射系数采用混响声场中各种角度无规入射的平均透射系数。
4)  engineering prediction
工程估算
1.
The engineering prediction method for aerodynamic characteristics of the symmetrical tactical missile configuration with inlet;
带进气道的面对称布局战术导弹气动特性工程估算
5)  duration estimate
工期估算
6)  Estimate at Completion
完工估算
补充资料:工料
①人工和材料(多用于制订计划或计算成本时)。②指工程所需的材料:购买~。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条