1) industrial engineering estimation method
工业工程估算法
2) engineering evaluation method
工程估算方法
1.
In this paper,some engineering evaluation methods of J-integral are described,some problems in these methods are raised,and the developing trend of these methods is discussed.
本文介绍了几种J积分工程估算方法,提出了当前这些估算方法存在的问题,讨论了今后的发展方向,为进一步发展含缺陷结构断裂评定方法提供帮助。
3) estimating method of construction coefficient
工程系数估算法
4) engineering estimation
工程估算
1.
Engineering estimation for mean temperature and rupturing time of rotating cylinder shell irradiated by laser beams;
激光辐照下转动柱壳平均温度与破坏时间的工程估算
2.
Missile Datcom software,which was developed by the United States Air Force(USAF) for engineering estimation of the missile aerodynamic force,is practical at the design stage of aircraft.
结果表明,该软件在一定范围内能提供较高精度的气动力系数估算结果,对不同导弹气动力外形具有较强的适用性,为国内气动力工程估算提供了一套通用工具。
3.
A simple engineering estimation method derived from classical sound transmission theory was established.
本文从经典的声波透射理论出发,建立了一种较简单的空气噪声传递产生水下噪声的工程估算方法,其中壳板的声压透射系数采用混响声场中各种角度无规入射的平均透射系数。
5) engineering prediction
工程估算
1.
The engineering prediction method for aerodynamic characteristics of the symmetrical tactical missile configuration with inlet;
带进气道的面对称布局战术导弹气动特性工程估算
6) Engineering Estimated Formula
工程估算式
补充资料:工业工程
工业工程
工业工程研究由人、原材料、机器设备等组成的统一系统的设计、设置和改善的一门学科。其内容就是运用数学、工程学、物理学、经济学等专门知识,将工业企业的人力、物料、设备及生产经营过程进行详尽系统的分析、评价和预测,设计出最科学的生产操作程序和工作方法,改进企业管理,从而创造最优效率。这种管理方法目前在国际上极为流行。它最早产生于美国。20世纪初,美国制造业企业从分析操作动作与时间入手,改进生产工序,制定工作标准和工资制度等,以达到提高劳动生产率的目的。随着科学技术的发展,工业工程不断运用新的学科知识丰富自己,从而得到长足发展,涉及的领域越来越广泛。到第二次世界大战后,工业工程已广泛应用于农业、建筑业、商业、交通运输业和服务业。工业工程主要的工作程序是:①观察记录工作状况。②分析原始记录。③设计出新的方法。④量化新工作方法,制定标准。⑤组织实施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条