1) 0# block hangly cast
0#块悬浇
2) null block
0块
1.
This paper presents an efficient coding algorithm that exploits a considerable number of null blocks and sub-null blocks in the encoded streams.
263编码后出现大量的0块,提出了对0块和0子块的预测算法,从而避免无效编码,在达到提高编码速度的目的的同时几乎没有带来额外的失真。
3) segment No.0
0#块
1.
Analysis of 3D stress at segment No.0 of Liuyang River bridge;
浏阳河大桥0#块空间应力分析
2.
For the complex structure and stress state of segment No.
针对矮塔斜拉桥结构的0#块构造及受力复杂,采用三维实体单元建立0#块的空间局部计算模型,分别计算了施工阶段及成桥运营阶段两种工况下的应力,计算结果对同类桥梁0#块设计有重要的参考价值。
3.
In the construction process of segment No.
铜九铁路吴家湾特大桥连续梁0#块施工过程中,根据现场实际,利用承台首先支立钢管混凝土临时支墩,再通过墩身预埋件安装支架体系其它构件,并在钢管混凝土临时支墩顶部预埋螺纹钢伸入梁体,实现梁体与临时墩的临时固结,完后进行混凝土浇筑。
4) suspended casting
悬浇
1.
Connecting with the construction case, this paper introduces the construction technique for suspended casting with form travelers with front-point and integral wood internal form.
结合工程实例,本文介绍了主梁前支点挂篮的悬浇及整体木内模施工技术。
2.
The method, procedure and selection of construction parameters of suspended casting construction control for Wenzhou Bridge, as well as measures dealing with various kinds of problems during construction control are introduced.
介绍温州大桥悬浇施工控制的方法、程序、施工参数的选择 ,及其控制过程中出现的各类问题的解决方法。
5) segment No.0
0号块
1.
In this paper,the three-dimensional finite element model is established for the part of the rigid fixity to analyze the local stress at the part and particular efforts are made to analyze the influence of load action from the pylon to the main girder on the stress of segment No.
重点分析桥塔作用在主梁上的荷载对0号块主梁应力的影响,以及竖向及横向预应力荷载的效应。
2.
Due to the extreme complexity of segment No.
以水南特大桥主桥为研究对象,利用大型通用有限元程序MIDAS/Civil建立了该桥桥墩0号块的空间有限元计算模型,对0号块在施工阶段及成桥运营阶段两种工况下的应力进行了分析。
6) box girder 0#
箱梁0#块
1.
The new-beach-bridge box girder 0# adopted the construction scheme which setting the steel corbel on the thin wall pillar side as mainly holding component,contemporarily using independently designed compound section steel box girder and Behre beam separately as temporary supportting structure system for the vertically and horizontally stressing main girder.
新滩大桥箱梁0#块施工方案采用了薄壁墩侧面设置钢牛腿作为主要承力构件,且自行设计的组合截面钢箱梁和贝雷梁分别作为纵横向受力主梁的临时支撑结构体系。
补充资料:嚚浇
1.奸诈刻薄。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条