说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 悬浇
1.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
2.
Research on the Vertical Joint of PC Concrete Box Girder Bridge
悬浇预应力箱梁桥竖向接缝试验研究
3.
Design and Calculation of Suspension Cast Cradle of Tianzhuangtai Bridge on G305 Line
G305线田庄台大桥悬浇挂篮设计与计算
4.
Load Investigation During Construction of Long-Span Continuous Beam Bridge by Cantilever Casting;
大跨度悬浇连续梁桥施工期荷载调查分析
5.
Key method of quality control for cast-in-place cantilever bridge and progress management;
挂篮悬浇质量控制关键技术及进度管理
6.
On construction technology of suspending irrigated variable cross-section prestressed continuous box-girder bridge
悬浇变截面预应力混凝土连续箱梁桥施工技术
7.
Suspended Casting of Continuous Box Beams with Imbalance between Side and Central Spans
浅谈边中跨重量不平衡连续箱梁悬浇施工
8.
The Lineal Mass Control Method of Cast-in Main Pier of Concrete Cable Stayed Bridge
混凝土斜拉桥主梁悬浇的线形质量控制
9.
Analyse and Control of Cracks of Prestressed Concrete Box Girder Web
悬浇箱梁节段张拉后腹板裂纹成因分析与防治
10.
Forcing analysis of the temporary support of the cantilever casting box beam on the Xintongyang canal super large Bridge
新通扬运河特大桥悬浇箱梁临时支承受力分析
11.
Research on the stability of cast-in-place cantilever construction of the Hefei Paihe bridge with cradles
合肥市派河大桥挂篮悬浇施工稳定性探析
12.
The linearis monitoring under skew continuous box girder bridges cast with balanced cantilever method
悬臂浇注斜交连续箱梁桥的线形监控
13.
Model Testing Study on Construction Control of Arch Bridge with Cast-In-Place Canlilever Method;
拱桥悬臂现浇施工控制模型试验研究
14.
Cantilever Construct Technology for Main Box Girder of Fengpu Bridge;
奉浦大桥主桥箱梁悬臂浇筑施工技术
15.
Monitoring Techniques of Cantilever Pouring Construction of Mashuihe River Bridge
马水河特大桥悬臂浇筑施工监测技术
16.
In-situ Monitoring Technology on Continuous Rigid Frame Cantilever Casting Beam
连续刚构悬臂浇筑段的现场测控技术
17.
Research on Cast-in-Place Cantilever Construction Technology of Cable-Stayed Truss Bridge
斜拉桁架桥的悬臂浇注施工工艺研究
18.
Model Testing Study on the Construction of Reinforced Concrete Arch Bridge with Cast-in-Situ Cantilever Method;
悬臂浇筑钢筋混凝土拱桥模型试验研究