1)  Active Service
现役设备
2)  the Active Service
现役
3)  the existing dam
现役大坝
1.
This article discusses the hydraulic risk rate of the existing dam based on the achievement of hydraulic model test.
在水工水力学模型研究成果基础上,采用MC法对现役大坝泄洪能力风险率做进一步探讨,研究表明:(1)水力的不确定性对大坝防洪安全确实存在影响,但风险值较小;(2)国内绝大多数大中型现役坝的水力风险几近为0,设计偏于保守。
4)  service power plant
现役电厂
1.
Based on the feasibility analysis of service power plant heating system retroffiting, the authors believe that heating system retroffiting of power plants with 125 MW or higher condensed steam units are technically feasible.
文章通过对三北电网区域现役电厂供热改造可行性研究的调研评估分析,认为城市周边现役电厂125MW及以上纯凝机组供热改造在技术上是可行的,可合理利用现有电源资源,替代老小热电、集中锅炉房和分散小锅炉供热,提高能源综合利用效率,有利于节能降耗和宏观调控。
5)  equipment in service
现役装备
6)  existing structure
现役结构
1.
he randomness of various parameters, the fuzziness of failure criteria and the timevarying of structural resistance are synthetically considered in accordance with the special characteristics of existing structures.
针对现役结构特点,综合考虑了有关参数的随机性、结构失效准则的模糊性和抗力的时变性。
参考词条
补充资料:净化设备——混凝设备
净化设备——混凝设备
 

 

 

 
文章编辑:moji
说明:补充资料仅用于学习参考,请勿用于其它任何用途。