说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 土石混填路基
1)  soil-rock mixture subgrade
土石混填路基
1.
Firstly,in view of the characteristic that the solid(soil and rock) volume will not change in the soil-rock mixture subgrade when it is loaded,a model which describes the change of porosity in the soil-rock mixture subgrade is established,moreover,the changing regularity of the deformation modulus of soil-rock mixture subgrade is also deduced.
针对现有路基压实度检测方法的局限性与不足,首先,利用土石混填路基在受载前后岩土颗粒体积不变的特性,建立出土石混填路基孔隙率的变化模型,导出土石混填路基变形模量的变化关系;其次,将土石混填路基视为半无限弹性空间,并考虑路基在荷载作用下变形模量发生变化的特征,引进分级加载的思想,导出基于布辛奈斯克解的土石混填路基在竖向荷载作用下的变形或沉降计算方法;然后,将土石混填路基初始孔隙率与荷载位移曲线建立关系,从而提出基于静载试验的土石混填路基压实度检测新方法;最后,将现场试验数据与基于理论公式进行拟合分析,其结果与传统方法较为接近,新方法具有可行性与合理性。
2.
Compaction Quality of soil-rock mixture subgrade is difficult to control.
土石混填路基压实质量的控制一直是一个难题,利用一般的压实度检测方法存在许多局限性与不足。
3.
As the highway construction extends over mountainous distinct, soil-rock mixture subgrade, one of the highway subgrade forms, has become more universal in the day.
随着公路建设向山区延伸,土石混填路基已成为较普遍的公路路基形式之一,为保证土石混填路基建设的快速施工及其填筑质量,必须开发土石混填路基压实度的快速而可靠的检测新技术,但是,目前土石混填路基压实度的检测方法仍沿用传统的灌水(砂)法或波法,其存在对路基破坏性大或检测精度差或检测效率低等缺陷与不足,难以适用土石混填路基压实度快速检测的工程要求,因此,本文结合湖南省高速公路管理局压实度检测研究项目展开深入系统的研究,以期建立土石混填路基压实度检测新方法,具有重要的理论与工程实用价值。
2)  soil and rock aggregate mixture embankment
土石混填路堤
1.
The soil and rock aggregate mixture embankment,filled with the mudstone,sandstone and shale which are common in Chongqing,is expounded as the research elements.
以重庆渝邻高速公路常见的泥岩、砂岩和页岩土石混填路堤为研究对象,通过强夯试验研究确定强夯再压实的夯击参数及质量控制标准,用以指导渝邻路高填方路堤的施工并达到预期加固效果。
3)  soil-stone embankment
土石混填
1.
Construction quality control of soil-stone embankment;
土石混填路基施工质量控制
2.
Nondestructive detection for compaction quality of soil-stone embankment;
土石混填路基压实质量无损检测技术
4)  rock-soil filled
土石混填
1.
2D mechanical model tests on settlement of rock-soil filled roadbed;
土石混填路基沉降变形特征的二维力学模型试验研究
2.
The compaction effect of rock-soil filled roadbed is evaluated by field CBR,and the results of field CBR test is compared with the results of traditional dry density,differential settlement and deflection tests.
介绍了现场CBR试验的基本原理和测试方法,应用现场CBR值评价高速公路土石混填路堤的压实效果,并与传统的干密度测试、沉降差测试和弯沉测试结果进行了对比分析。
3.
To reveal the settlement mechanism of the rock-soil filled roadbed,and provide basis for design and construction,this study carried centrifugal model test through rock-soil filled roadbed with different density and different granule composition,the test(reproduce) the process and the final mode of the settlement.
为了揭示土石混填路基的沉降变形特性,为设计和施工控制提供依据,进行了不同含水率、不同压实度和不同颗粒组成土石混填路基的离心模型试验,再现了土石混填路基的沉降变形性状。
5)  rock fill roadbed
填石路基
1.
Combined with the scene test and engineering practice, this paper discusses the total quality management of rock fill roadbed.
对于填石路基填料,现行规范对其压实质量的控制缺乏有效指导。
2.
Quality control of rock fill roadbed is tested in a practical project.
针对兰州至临洮高速公路第8B合同段填石路基压实工程的特点,借鉴了以往填石路基工程实践的经验和教训,进行了相关的工程质量管理试验。
6)  rock-fill roadbed
填石路基
1.
In view of the features of the fillers of the rock-fill roadbed,this paper makes definition of the rock-fill roadbed,and puts forward the impaction detecting methods and the quality control standards for the transition rock-fill roadbed.
通过对填石路基填料特性的了解,对填石路基进行了界定。
2.
Connecting with the field test and engineering practice,and through the comprehensive analysis on the factors influencing the compacting effect such as the compacted depth of the rock-fill roadbed,the maximum particle size of the fillers,the compacting machineries,and the compactor pass,etc.
结合现场试验路和工程实践,通过对填石路基压实厚度、填料最大粒径、压实机械及压实遍数等影响压实效果的因素的综合分析,建立了定量评定超重载下填石路基压实质量的控制标准。
补充资料:路基填土压实
      采取分层填土,分层夯压的路堤,以达到足够的密实度,从而提高路堤的稳定性和坚固性,保证车辆运行平稳,避免因长年沉落而恶化运营条件。经过压实的路堤,一般线路要求通车时即可行每小时40~60公里以上的速度。
  
  土的含水量对压实程度有很大影响。同样的土质,在同样夯压条件下,含水量不同,填土密度(用干容重уd表示)也不同。含水量w与уd间的关系曲线称为击实曲线(见图)。从图中可看出,当含水量增加时,开始时土的密度相应增加,当含水量达到某一特征含水量w0时,密度增到最大值у。此后随着含水量增加而密度逐渐减小。此特征含水量称为最佳含水量,相应的最大密度у称为最佳密度。
  
  
  填土的最佳密度和最佳含水量可用击实仪按规定的击锤重量、落锤距离和锤击次数,用不同的含水量反复试验而得。常用的击实仪采用"普氏标准"(锤重2.51公斤,落高30.48厘米,锤击面直径5.08厘米,试筒直径10.12厘米,试筒高11.65厘米,分三层击实,每层击25次)。高速公路要求填土压实的密度较大,英国公路协会规定有较高标准击实仪。
  
  世界各国对于路基填土压实的密度均有不同的规定。中国铁路对旧线土质路堤填土密度进行调查结果表明,路堤基床(路基面至其下 1.2米范围内为基床)密度为最佳密度的84~93%;基床以下为最佳密度的75~84%(此种百分数称为压实系数)。中国铁路对填筑路堤要求的压实系数,基床表层(基床上部 0.5米范围内)为0.95,基床底层(基床下部0.7米范围内)为0.90;基床以下不浸水部分为0.85,浸水部分为0.90。中国公路建筑要求对一般地区,在路堤表面下0~0.8米间,要求压实系数不小于0.95,0.8米以下不小于0.90。为保证路堤夯压的密度,要求填筑时土的含水量应等于或接近最佳含水量,当含水量超过规定时,施工中需要采取措施。
  
  夯压机具及夯压方法对压实质量及工效的影响较大,80年代有夯打、辗压和振动三类夯压机具。经验证明,采用重型轮胎压路机、振动压路机,以及20~65吨圆碾或羊足碾的碾压效率高,宜用于路基填筑工程。而小型的夯土机(如联动打夯机)则适用于小面积的填土。为了确保填土密度达到规定的要求,施工前应在工地进行夯压遍数与密度的工地试验,据此制定施工计划以指导施工。在填筑路堤时,应随时在工地取样,用湿度密度仪检查含水量和干容量。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条