1) three usages of one pile
一桩三用
1.
The fender piles can be used as engineering piles to resist the loads of upper structure or as anti-floating piles for the basement, as well as the retaining structure during the excavation of foundation pit, which is called as the thecnique of three usages of one pile.
“一桩三用”技术将排桩围护体系加以利用 ,围护桩除了在基坑开挖过程中作为挡土结构之外 ,还可作为建筑物工程桩承担上部结构荷载或作为地下室抗浮桩 ,同时通过桩墙合一技术使排桩与地下室外墙形成复合结构共同抵抗水土压力。
2) dual-purpose pile
一桩两用
1.
The application of dual-purpose pile is a technique in which retaining piles are combined with outer walls of substructures to resist the earth pressure.
"一桩两用"技术是在基坑开挖过程中通过桩墙合一技术将排桩支护结构体系与地下室外墙形成复合结构,共同抵抗土压力。
3) One equipment three uses
一机三用
4) one point for three uses
一点三用
1.
This paper points out specific method of one point for two uses,one point for three uses.
在使用可编程控制器PLC中,会经常遇到检测开关量的信号点数大于PLC的输入点数,本文提出一点二用、一点三用、一点四用等具体方法,可以有效的解决此类问题。
6) one column with one pile
一柱一桩
1.
Lateral rigidity problem for a one story factory building which is one column with one pile;
一柱一桩基础单层厂房的侧向变位问题
补充资料:建设用地“三参三查”
建设用地“三参三查”
[建设用地“三参三查”管理”。见“建设用地全程
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条