1.
APPLICATION OF“ONE PILE WITH THREE USES”TECHNOLOGY IN FOUNDATION PIT WORK
基坑工程中“一桩三用”技术的应用
2.
Analysis of rock-socketed pile uniaxial compressive strength and bearing capacity of pile tip at three dimensional effects
嵌岩桩单轴抗压强度和三维作用下桩端承载力
3.
The standingpile wharf is one of the three major structure forms of the quay, it has been applied quite extensive in our country.
高桩码头是码头的三大结构形式之一,在我国应用相当广泛。
4.
A fence needs the support of three stakes, an able fellow needs the help of three other people.
一个篱笆要打三个桩,一个好汉要有三个帮。
5.
An able fellow needs the help of three other people, a fence needs the support of three stakes.
一个好汉也要三个帮,一个篱笆也要三个桩。
6.
Three-Dimensional Numerical Simulation of Pile-Soil-Structure Interaction;
桩—土—结构相互作用三维数值模拟
7.
The 3-D Simulation Analysis of a Bridge Stake Foundation in the Action of Dead Load;
恒载作用下桥梁桩基础三维仿真分析
8.
Technique Application of 3-phase Separator in Zhuang1 Block Station
三相分离器技术在桩1接转站的应用
9.
The tree stump serves as a table; The female students served as a control group; This table would serve very well; His freedom served him well; The table functions as a desk.
三个树桩像一张桌子一样服务;女学生作为一个。
10.
As for the third message, it referred to a very simple error which could be set right in a couple of minutes.
至于第三条指示,说的是一桩小错,实在简单之极,改过来都用不了几分钟。
11.
Study on Anchorage Pile in Baiyangou Landslide
锚拉桩在三峡库区白岩沟西滑坡治理中的应用
12.
3D Finite Analysis on Pile-Raft Foundation Interaction for Highrise Buildings;
高层建筑筏板—桩三维有限元协同作用分析
13.
3-D Finite Element Analysis of Shear Wall-Piled Raft-Soils Interaction;
剪力墙—桩筏基础—地基共同作用三维有限元分析
14.
3D Nonlinear Analysis of Pile-Soil Interaction in Lateral Spreading of Liquefied Ground
土液化横向流动中桩土相互作用三维数值分析
15.
Deep Sampling Equipment Development and Its Application of Soil-Cement Mixed Pile by Triaxial Stirring Machine
三轴水泥土搅拌桩深层取样装置研制及其应用
16.
Comparison of three post core crown rehabilitation for tooth defect
三种桩核冠修复在牙体缺损治疗的应用比较
17.
Three-dimensional Finite Element Analysis for the Interaction of Uplift Pile and the Metro Station Structures
抗拔桩与主体结构相互作用的三维有限元分析
18.
On the application of the cast-in-place bored piles' reverse circular technique in No.3 Bridge of Wei river
钻孔灌注桩反循环工艺在渭河三号桥中的应用