说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 双曲挑坝
1)  double-curvature flip bucket
双曲挑坝
2)  hyperbolic arch dam
双曲拱坝
1.
Construction technology of masonry hyperbolic arch dam;
浆砌石双曲拱坝施工技术
2.
This paper carries on the statistics of extreme value in the bias field and the stress field and analyzes sickness danger reason of lays with the mortar stone hyperbolic arch dam.
基于邓肯—张(Duncan and Zhang)非线性模型的三维有限元理论,采用有限元法计算拱坝在各种工况下的位移场及应力场,对位移场及应力场中的极值进行统计,分析浆砌石双曲拱坝的病险原因。
3.
A complete and effective technological system for the hyperbolic arch dam con-struction including establishing a control network for construction, setting and calculatingthe coordinates of setting-put point and setting-out survey, was proposed- The constructionprecision is increased by controling the shape of hyperbolic arch dam.
从建立施工控制网、设置计算放样点坐标和施工放城点测量方面建立了一个完整、有效的双曲拱坝体型施工控制技术体系,从而提高了施工精度,解决了双曲拱坝体型控制的难题。
3)  double-curvature arch dam
双曲拱坝
1.
RCC construction techniques of the double-curvature arch dam for the Linhekou Hydropower Station in Shaanxi;
蔺河口水电站双曲拱坝碾压混凝土施工技术
2.
Discussion on concrete temperature control and crack control of Zhougongzhai double-curvature arch dam
周公宅水库双曲拱坝混凝土温度控制及防裂措施探讨
3.
With the example of Zhaolaihe double-curvature arch dam framework design with characteristics of big curvature,big overhanging angle and big height,this paper describes the continuous climbing formwork system applicable to the construction and continuous rising of big double-curvature RCC dam.
结合具有曲率大、倒悬度大及高度高等特点的招徕河双曲拱坝模板规划设计这一工程实例,研制出一套适用于大曲率碾压混凝土双曲拱坝施工连续上升的模板体系。
4)  arch dam
双曲拱坝
1.
Hydropower arch dam foundation excavation and processing design of Ying Yue Tan;
映月潭水电站双曲拱坝基础处理设计
2.
Design height of Niutoushan arch dam is 108m, which is located on the v-shaped river valley, favorable for building arch dam.
牛头山水电站双曲拱坝设计坝高108m,其坝址河谷呈V形,有良好的建坝条件,但基础左坝肩、右坝肩均存在断层和深部裂隙等地质缺陷,成为工程的隐患。
5)  double curvature arch dam
双曲拱坝
1.
Stress analysis of double curvature arch dam with upper outlet, horizontal beam and pier;
坝顶开孔的双曲拱坝设置水平梁和闸墩的应力分析
2.
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.
阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
3.
The Laxiwa double curvature arch dam,with the maximum dam height of 250 meters,is located in an area with strong seismic activity.
拉西瓦双曲拱坝最大坝高250m,坝址所处地区地震活动性强,为此,根据DL5073—2000《水工建筑物抗震设计规范》的原则、方法和要求,在考虑地形地质条件、地基辐射阻尼及横缝非线性影响的条件下,采用三维有限元法对大坝及其基础进行动、静力分析,并用水弹性模型试验进行验证,综合分析评价了大坝抗震安全性能。
6)  double-curved arch dam
双曲拱坝
1.
The sliding stability of the abutments of Jiangpinghe double-curved arch dam is analyzed by 3-D nonlinear FEM with strength safety coefficient.
采用三维有限元方法,用强度储备系数,对江坪河双曲拱坝坝肩抗滑稳定性进行分析。
2.
Considering the construction work of Dongping concrete double-curved arch dam is high intensive and pressed for time, a number of new technologies about formwork, reinforcement processing, concrete placing, temperature control etc.
针对洞坪工程混凝土双曲拱坝施工强度大、工期紧、技术与质量要求高、温度控制严等特点,在施工中对模板、钢筋、混凝土浇筑、温度控制等方面采用新工艺、新技术,为确保拱坝的混凝土浇筑质量和快速施工提供了保障。
3.
Thus, fine quality of the double-curved arch dam is gained.
恩施州水电监理咨询有限公司芭蕉河监理部在芭蕉河二级水电站浆砌石双曲拱坝施工质量控制过程中,始终坚持质量第一的原则,推行规范化、科学化、程序化的管理模式,建立、健全质量保证体系,重视原材料、半成品、成品的检验和跟踪监控,确保了优良的施工质量。
补充资料:双曲拱坝
      双向(水平向及竖向)弯曲的拱坝。它是拱坝中最具有代表性的坝型。双曲拱坝的水平向弯曲可以发挥拱的作用,竖直向弯曲可实现变中心、变半径以调整拱坝上下部的曲率和半径。双曲拱坝的优越性可从这两个方向的弯曲中体现出来。一般情况,上部半径大些,可使拱座推力更指向岸里;下部半径小些,可适当加大下部中心角以提高拱的作用。因此,双曲拱坝一般均采用变中心、变半径布置,具体又有等中心角及变中心角之分和拱冠梁有近乎直立和俯向下游之分(见拱坝)。为适应特定的地形、地质和溢洪、泄水及厂房布置要求,使拱坝体型、应力及拱座稳定等更趋合理,可调整双曲拱坝的各种参数,并可在坝基增设垫座以周边缝与坝身分开,或在坝身设置切入缝和分离缝等(见图)。设置周边缝和垫座一般可改善地基(特别是不均匀或不规整地基)对拱坝坝身应力的影响,及改善或降低坝基(即垫座底部)应力以适应地基的要求。设置切入缝或分离缝可改变拱梁系统荷载分配以改善坝身及坝基应力以适应特定的要求。周边缝、切入缝及分离缝自20世纪50年代以后才逐渐出现。它们改进了拱坝应力并扩大了拱坝的应用范围,优点较多。但也有人认为这些缝破坏了拱坝的整体性,削弱了坝体强度,其结构作用不明确。虽然对它们的作用至今还存在肯定和怀疑两种不同的观点,但从世界修建拱坝的实践看,这些结构缝屡见不鲜,且有逐渐增多的趋势。
  
  
  20世纪50年代前后,意大利、瑞士、法国建成了较高的有代表性的双曲拱坝。当时最高的意大利瓦依昂拱坝,高262m,最大底厚22.1m,厚高比仅0.084;瑞士莫瓦桑拱坝高237m,最大底厚53.6m,厚高比为0.227。这些双曲拱坝的建成,标志着拱坝的设计施工达到了一个新的水平。意大利著名工程师C.塞门扎等称:双曲拱坝体形的决定在很大程度上依靠模型试验。50~60年代许多著名的双曲拱坝的体型设计都是出自世界上著名的意大利模型和结构试验研究所。当前电子计算技术的发展,拱坝体型优化已能通过计算解决。过去有人认为双曲拱坝对溢洪及泄水不利,但通过许多工程的实践,这个问题已逐渐趋于解决。如利用双曲拱坝稍向下游俯悬,可以使坝顶溢流及坝身泄水孔射流抛离坝脚。中国正在施工的二滩拱坝高240m,设计使坝顶溢流水舌与坝身中泄水孔水舌在空中相撞并在坝趾下游修建消能塘,总溢流及泄流量高达13000m3/s,消能效果较好。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条