新丰根坝 |
Shintoyone Dam |
概 述 |
新丰根坝位于日本爱知县北设乐郡丰根村、天龙川水系(Tenryugawa)中游支流大入川上。非对称双曲抛物线拱坝,最大坝高116.5m,水库总库容0.535亿m3。水库是新丰根抽水蓄能电站的上水库,该抽水蓄能电站是一座混合型的装机112.5万kW电站。水库兼有防洪作用。1969年11月开工,1972年主体工程完工。 |
|
|||||||
说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
|
|||||||
1) Fengle Double Arch Dam
丰乐双曲拱坝
2) Fengle arch dam
丰乐拱坝
3) hyperbolic arch dam
双曲拱坝
1.
Construction technology of masonry hyperbolic arch dam;
浆砌石双曲拱坝施工技术
2.
This paper carries on the statistics of extreme value in the bias field and the stress field and analyzes sickness danger reason of lays with the mortar stone hyperbolic arch dam.
基于邓肯—张(Duncan and Zhang)非线性模型的三维有限元理论,采用有限元法计算拱坝在各种工况下的位移场及应力场,对位移场及应力场中的极值进行统计,分析浆砌石双曲拱坝的病险原因。
3.
A complete and effective technological system for the hyperbolic arch dam con-struction including establishing a control network for construction, setting and calculatingthe coordinates of setting-put point and setting-out survey, was proposed- The constructionprecision is increased by controling the shape of hyperbolic arch dam.
从建立施工控制网、设置计算放样点坐标和施工放城点测量方面建立了一个完整、有效的双曲拱坝体型施工控制技术体系,从而提高了施工精度,解决了双曲拱坝体型控制的难题。
4) double-curvature arch dam
双曲拱坝
1.
RCC construction techniques of the double-curvature arch dam for the Linhekou Hydropower Station in Shaanxi;
蔺河口水电站双曲拱坝碾压混凝土施工技术
2.
Discussion on concrete temperature control and crack control of Zhougongzhai double-curvature arch dam
周公宅水库双曲拱坝混凝土温度控制及防裂措施探讨
3.
With the example of Zhaolaihe double-curvature arch dam framework design with characteristics of big curvature,big overhanging angle and big height,this paper describes the continuous climbing formwork system applicable to the construction and continuous rising of big double-curvature RCC dam.
结合具有曲率大、倒悬度大及高度高等特点的招徕河双曲拱坝模板规划设计这一工程实例,研制出一套适用于大曲率碾压混凝土双曲拱坝施工连续上升的模板体系。
5) arch dam
双曲拱坝
1.
Hydropower arch dam foundation excavation and processing design of Ying Yue Tan;
映月潭水电站双曲拱坝基础处理设计
2.
Design height of Niutoushan arch dam is 108m, which is located on the v-shaped river valley, favorable for building arch dam.
牛头山水电站双曲拱坝设计坝高108m,其坝址河谷呈V形,有良好的建坝条件,但基础左坝肩、右坝肩均存在断层和深部裂隙等地质缺陷,成为工程的隐患。
6) double curvature arch dam
双曲拱坝
1.
Stress analysis of double curvature arch dam with upper outlet, horizontal beam and pier;
坝顶开孔的双曲拱坝设置水平梁和闸墩的应力分析
2.
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.
阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
3.
The Laxiwa double curvature arch dam,with the maximum dam height of 250 meters,is located in an area with strong seismic activity.
拉西瓦双曲拱坝最大坝高250m,坝址所处地区地震活动性强,为此,根据DL5073—2000《水工建筑物抗震设计规范》的原则、方法和要求,在考虑地形地质条件、地基辐射阻尼及横缝非线性影响的条件下,采用三维有限元法对大坝及其基础进行动、静力分析,并用水弹性模型试验进行验证,综合分析评价了大坝抗震安全性能。
补充资料:新丰根坝
|