1) three-dimensional deformation monitoring in a tunnel
隧洞三维监测
2) 3D monitoring of tunnel slope deformation
隧道边坡变形三维监测
3) 3D monitoring
三维监测
1.
The deformation reason can be confirmed as the results of concentrated drainage of valve chamber traffic tunnel by analyzing 3D monitoring data of the slope deformation body surface behind Shawan hydropower house in Muli River.
通过对木里河沙湾水电站厂房后边坡变形体的地表三维监测资料的分析,可以判断其变形是由于阀室交通洞的集中排水造成的,由于厂房边坡开挖、S216省道改线和雨季降水入渗等因素的共同作用,进一步加剧了边坡的变形。
4) monitoring of slope deformation in twin-arch tunnel
隧道边坡变形洞内监测
5) three-dimensional monitor network
三维监测网
1.
Then, the paper essentializes the two key problems in the course of building a three-dimensional monitor network: the optimum geometrical graph and the precision distance surveying.
在建立滑坡外部变形测边三维监测网的探讨中,推导出了变形向量的解算公式,并给出了精度估算公式。
6) Sandouyan Tunnel
三陡岩隧洞
1.
Drill and blast tunneling of Sandouyan Tunnel for Guandi Hydropower Station;
官地水电站三陡岩隧洞钻爆开挖施工
补充资料:导流隧洞
导流隧洞
diversion tunnel
dooll一」sLJJdorlg导流隧洞(diversion tunnel)建筑物。见导流泄水
说明:补充资料仅用于学习参考,请勿用于其它任何用途。