1) Baishuikeng Hydroelectric Power Plant
白水坑水电站
1.
The application of vibratory stress relief to a large steel manifold at the Baishuikeng Hydroelectric Power Plant has made great pro-gresses in eliminating residual stresses of manifolds.
通过振动时效工艺在白水坑水电站大型钢岔管中的实际应用,说明该项技术能在消除岔管残余应力中取得明显成效。
2) Tankeng Hydropower Station
滩坑水电站
1.
New Dam Construction Technology of Facing Rockfill Dam of Tankeng Hydropower Station;
滩坑水电站面板堆石坝筑坝新工艺
2.
Construction Divevsion and Flood Season for Tankeng Hydropower Station;
滩坑水电站施工导流与度汛
3.
Practice of Diversion Way of "Air Close First and Then River Closure" for Tankeng Hydropower Station;
滩坑水电站“先闭气后截流”导流方式的实践
4) Baishan Hydropower Station
白山水电站
1.
Study on discharge splashing atomization and protection works for Baishan Hydropower Station;
白山水电站泄洪溅水雾化与防护工程研究
2.
Application of shrinkage-compensating silicon powder concrete to Baishan Hydropower Station;
补偿收缩硅粉混凝土在白山水电站的应用
5) Baishuiyu hydropower station
白水峪电站
1.
In connection with the existing problems of the DC system in operation of Baishuiyu hydropower station, a renovation plan for it is completed to meet the requirement of more safe and reliable operation.
根据白水峪电站直流系统运行情况,找出直流系统存在的问题,有针对性地进行直流系统更新改造,使新的直流系统更安全可靠,适合电站运
6) Baisha hydropower station
白沙水电站
1.
The drawback and corrective measure of bulb turbine in Baisha Hydropower Station;
白沙水电站灯泡贯流式机组缺陷及改进措施