1.
The determination of base plate thickness, the calculation of base plate stability.
文章介绍了白山水电站消能塘结构布置、板厚度的确定以及底板稳定的计算。
2.
Investment control during construction phase of Baishan Pumped Storage Hydropower Station;
白山抽水蓄能电站工程实施阶段投资控制
3.
Forces on Upper Elbow Section of Water Intake and Outlet in Upper Reservoir at Baishan Pumped Storage Power Station
白山抽水蓄能电站上库进出水口上弯段结构受力浅析
4.
Reconstruction of submerged trash rack for Baigou HPP
白垢水电站水下拦污栅改造方案比选
5.
Study of Sediment Accumulation and Diversion of Water to Control Sediment in Hydropower Stations in Mountain River
山区河流引水式电站水库泥沙淤积及电站引水防沙问题研究
6.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
7.
A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project
秦山三期(重水堆)核电站工程进展概况
8.
Technical improvement in Qinshan Phase Ⅲ nuclear power plant after commercial operation
秦山三期(重水堆)核电站的技术改进
9.
Proposal and Engineering Design of System Communication for Shanxiu Hydropower Station
山秀水电站系统通信方案及施工设计
10.
The Effect of Vegetation Restoration on Damaged Mountain Body of Taishan Pumped Storage Power Station
泰山抽水蓄能电站破坏山体植被恢复效应
11.
The Hydrogeological Analysis of Reservior-Induced Seimicity for DaGangShan Power Station;
大岗山电站水库诱发地震的水文地质分析
12.
Preliminary analysis on waste water treatment for Huashangou Hydropower Station in construction period
华山沟水电站工程施工期废水处理措施初探
13.
Water Sealing Engineering for Surrounding Slots of Face Rockfill Dam at Qinshan Hydropower Station
芹山水电站面板堆石坝周边缝止水施工
14.
The Construction Technology of Section Tunnel of Building Little Hydroelectric Station in LiangShan
凉山州小水电站特小断面引水隧道施工技术
15.
Study on Black Start Scheme for Shandong Grid by Pumped-Storage Power Plant;
利用抽水蓄能电站的山东电网黑启动研究
16.
Implementation of Primary Frequency Regulation on Water-turbine Generator Set in Xiaoshan Hydropower Station
小山电站水轮发电机组一次调频功能的实现
17.
Real Time Flood Forecast and Regulation System in Baiyun Reservoir;
白云水电站实时洪水预报调度系统研究
18.
Design of Pre-stressed Pier for Sluice Gate in Third Cascade of Baishuijiang Power Station
白水江三级水电站泄洪闸预应力闸墩设计