1) progrmme quickened the race
赶工计划
2) Catch-up Alternatives
赶上计划的备选方案
3) constructive acceleration
赶工
1.
The analyzing with incomplete information game theory for the cost of constructive acceleration;
关于赶工费用的不完全信息博弈分析
4) working procedure plan
工序计划
1.
The MES working procedure plan subsystem in No.
济钢三炼钢—中厚板MES工序计划子系统有标准管理、坯料设计、炼钢轧钢计划、冷送料作业管理、生产管制五大功能,工序计划编制内容包括板坯设计、炉次设计、连浇炉次、轧辊单位设计、指示下达等。
5) construction plan
施工计划
1.
This paper points out that before the construction of the coking oven,should compile the detailed and strict construction plan and construction period,and should implement the norms of the construction of the coking oven strictly,and puts forward some detailed methods for solving the problems frequently occurring in the construction of the coking ovens.
提出了砌筑焦炉前首先应编制详尽严谨的施工计划与工期,砌筑中严格筑炉规范。
2.
It is not until the beginning of actual construction that the construction planner can realize the validity of his construction operations planning.
工程施工计划是一项复杂的工作,不断增长的复杂因素决定了工程管理人员需要采取新的、从未被用过、检测过的工程施工方法。
补充资料:赶工
为按时或提前完成任务而加快进度:日夜~挖水渠。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条