1.
Research on JIT-based Procedure Plans Generation Algorithm for the Key Parts
基于JIT思想的关重件工序计划生成算法研究
2.
Project Plan Execution- carrying out the project plan by performing the activities included therein.
项目计划执行-行工序来实施项目计划。
3.
Product and Process Development Scheme
产品研制和工序创新计划
4.
Design and Implementation of City Mapping Information System
城市规划测绘工序管理的设计与实现
5.
disorganize a schedule, plan, etc
打乱程序、 计划等.
6.
The Program of control of aggregated pollutants and China Trans-Century Green Program were carried out smoothly.
污染物总量控制计划与跨世纪绿色工程规划的实施工作有序进行。
7.
Provide technical support and drive continuous improvement systems to achieve problem resolution.
根据生产计划制定供应商生产工序及质量体系.
8.
This program gives managers a valuable planning tool.
这套程序是经理人员制订计划的可贵的工具。
9.
A STUDY OF JOBS-RELATION ALGORITHM AND COMPLEXITY IN A PERT NETWORK;
网络计划图的工序关系及其复杂性研究
10.
Study on Theory of Activity Float Conservation in CPM Network
CPM网络计划中工序机动时间守恒性探究
11.
Study on Activity Float Transitivity in Activity-on-Arc Network Planning
双代号网络计划中工序机动时间传递性研究
12.
Using HACA to Solve Multi-stage Order Scheduling Model
用混合蚁群算法求解多工序订单生产计划
13.
Study of activity float spread property in activity-on-arc network planning
双代号网络计划中工序机动时间蔓延性研究
14.
Study on Dependence Relationship among Activities and Project Delay Claim Based on Network Planning;
工序间依赖关系与基于网络计划的工程拖延索赔研究
15.
Campaign Planning for Multi-stage Batch Processes with Limited Campaign Length;
活动长度有限制的多工序批量加工生产计划研究
16.
"Starts the Task Scheduler service so that scheduled programs will be run.
"启动“任务计划程序”服务,以运行计划的程序。
17.
Plan, organize and supervise a staff of engineers and related clerical workers engaged in developing manufacturing operations, methods and processes.
计划、组织、管理工程团队及有关人员建立制程、方法及程序。
18.
Optimization of quality cost becomes a new reference point to make decisions on inspection plan.
控制与优化质量成本将作为制定工序检验计划的一个新的参考点。