It summarizes several ways of pipeline laying in that re-gion and some insulatio n materials as well as related techniques.
简要介绍了冻土的分类、特性及国内外冻土地带管道建设的研究情况和防治冻害的措施,归纳总结了冻土地带管道敷设的几种方式以及寒冷地区管道保温材料和技术,对冻土地带管道建设的关键问题进行了讨论,并提出了建议。
2.
Caterpillar rock trencher will play an important role in practical pipeline laying process.
在管道施工建设中,对石方段的管沟开挖一直采用传统的爆破成沟的施工方法,而履带式岩石开沟机在管道敷设的实际应用中可以发挥重要作用。
3.
Secondly, it discuss es some practical problems on the design such as the system composition, the way s of pipeline laying, stem pipes and thermameters installing.
就供热采暖系统按户计量、分室调节的提出及设计中有关系统构成、管道敷设方式、干管立管及热表安装等技术问题进行了讨论 ,并阐述了设计和施工过程中的有关注意事
3)  Pipe laying
管道敷设
1.
Combined with practical design the arrangement and design of residential toilet are elaborated from the selection of sanitary apparatus, pipe laying, middle waterway design and other aspects; at the same time some suggestions are proposed.
就住宅卫生间布置的几个方面,结合工程设计体会,分析探讨了建筑给排水设计中卫生器具的选用、管道敷设方式、下沉室、中水道等设计特点,并提出一些建议。
2.
In allusion to the problems of household measurement and room adjustment design of heating system, this paper states technique problems in design and construction such as system composing and pipe laying.
本文就供热采暖系统按户计量、分室调节问题,阐述了在设计及施工过程中应注意的技术问 题如:系统构成、管道敷设方式等。
3.
The existing problems in water supply and drainage design of multistoried house are discussed from pipe laying and material selection.
从管道敷设、给水管材选用两方面介绍了多层住宅建筑给排水设计中存在的问题 ,提出多层住宅的管道敷设方式和管材选用要根据建筑的环境温度 ,结合业主的要求和住宅的档次来综合确定。
4)  pipelaying [英]['paipleiiŋ]  [美]['paɪpleɪŋ]
管道敷设
1.
Many factors shall be considered in terms of stress analysis of offshore pipelaying, including the curvature and length of pipe carrier, the tension and buoyancy on pipeline, pipe coating, and the mdeium to be transported.
在海洋管道敷设期间,对管道应力分析要考虑的因素很多,如托管架的曲率和长度、管道的张力和浮力、管道的覆盖层及其输送的介质,特别是当用敷管船敷设管道时,有很长一段管子悬在海水中,使管子存在较大的弯矩。
5)  channelling [英]['tʃænliŋ]  [美]['tʃænlɪŋ]
敷设管道
6)  Steam pipeline
蒸汽管道
1.
Direct-burying of steam pipeline;
浅谈蒸汽管道的直埋敷设
2.
In the light of the fact that elastic creep damage happens to heat resistant steel used as pressure elements like steam pipeline and steam pockets in heat-engine plants at high temperature and under high pressure,this article gives a complete constitutive description of the damage,building up the theory of phenomenology about creep damage.
针对火电厂中蒸汽管道与汽包类承压部件用的耐热钢 ,在承受高温高压时发生弹性蠕变损伤问题 ,给出完整的损伤本构描述 ,建立起唯象学蠕变损伤理论。
3.
A simple and easy density method for graphitization diagnosis of carbon steelsteam pipeline is developed.
采用密度法,对3个火电厂的主蒸汽管道石墨化程度不同的部位进行了密度测试,试验结果发现,石墨化程度越严重,密度越小。
补充资料:高温蒸汽管道寿命


高温蒸汽管道寿命
life time of steam pipings

  有问题时进行。 综合分析法较普遍的用于直管段材质寿命预侧,也可用于弯管等。是通过对超期运行燕汽管道的普查,然后选取一段或几段有代表性的管段进行鉴定试脸,再根据试验结果得出超期运行后钢管材料的组织性能水平,综合普查结果,分析确定可继续安全运行的时间.普查的目的:①了解运行历史,尤其是运行超温情况和历次姗变测t结果;②查清宏观缺陷情况,消除超标缺陷;③查清钥号和组织,消除错用钢材,了解金属组织性能变化程度,如球化程度等;④检查支吊架,消除缺陷并调整;⑤取出有代表性的管段,用于鉴定试验。鉴定试验包括钢的化学成分,室温和运行温度下的力学性能,金相组织检验,碳化物分析,姗变和持久强度试验以及考虑调峰及频繁起停工况时的姗变疲劳交互作用试验等.综合分析时除主要考虑持久强度值外,还孺综合考虑其他试验结果以及管道蠕变测量结果等,然后做出结论。限于持久强度外推时间限制,每次分析确定的可继续安全运行的时间最长为losh。对于超期运行的高温燕汽管道,综合分析法可在上次预侧寿命将到达时再次继续应用。 姗变空洞及裂纹检查法主要用于弯管、焊缝、三通、阀门等部件.对弯管外弯面、阀门壳体变截面处、三通肩部和腹部以及焊缝等应力集中地区作宏观峨变裂纹或疲劳裂纹检查.发现裂纹即行修补或更换。用复膜金相法作姗变空洞检验。检查部位与宏观姗变裂纹检查相同。利用如附图所示的与蟠变曲线的关系或峨变空洞量与寿命损耗程度的关系来决定其剩余寿命。黝耀铡崛 (h)(‘,怕》、(b)圈中熟点表示空洞、(‘)、(d,圈中己出现晶间裂纹 蟠变空洞与场变曲线的关系示意图 离皿燕汽,道的班寿主要延寿措施集中在弯管等易于应力集中的部件上,因为这些部件的寿命比直管短。主要延寿措施有设计时使弯管壁厚加厚并大于直管段。另外,也可用管道支吊架调整方法来使高温管goowen Zhengq一guondoo shoum一ng离温燕汽管道寿命(life time of steam pip-ings)高温蒸汽管道从开始运行至失效时的累计运行时间。火力发电厂的高温蒸汽管道主要指主蒸汽管道(包括母管)、高温再热蒸汽管道和导汽管等,是火电厂的重要高温部件。由于布里在锅炉和汽轮机之外,且用大口径钢管制造,一旦失效则会发生灾难性事故,因此研究并把握高温燕汽管道寿命,特别是超期运行电厂的蒸汽管道寿命,具有很重要的意义。 高温蒸汽管道设计寿命取决于管道设计时所取的持久强度极限的时间条件值。如取10”h或2X105h的持久强度极限作管道强度设计指标,则其设计寿命相应为10sh或2 xlo‘h。