说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 大柳树高土石坝
1)  Daliushu earth-rockfill dam
大柳树高土石坝
2)  Daliushu high dam
大柳树高坝
3)  Daliushu dam site
大柳树坝址
1.
Analysis of destructive mechanism of rock mass at Daliushu dam site;
大柳树坝址岩体破坏机制分析
2.
1709, the size of fault F201, whether F3 and F7 have been activated by fault F201 since late-Pleistocene, and relationship between faults in shallow crust and faults in deep crust under Daliushu dam site.
本文主要根据《黄河黑山峡河段地震地质补充论证工作报告》1,对黄河黑山峡河段大柳树坝址区主要地震地质问题,包括1709年中卫7?级地震的地表破裂带长度,F201断层的规模,坝址区F3、F7断层晚更新世以来是否被F201断层“牵动”,坝址区不同级别断层的深浅构造关系等主要方面的研究进展作一概要介绍。
3.
Taking Daliushu dam site as an example, the failure and deformation characters of in adits of loosened rockmass are studied.
 以黄河大柳树坝址为例,对松动岩体硐室围岩破坏变形特征进行了研究,松动岩体具有断裂张开、节理错动、岩体架空、岩石高强度、岩体波速等特征。
4)  Daliushu Dam-site
大柳树坝址
1.
Ground Stress Simulation near Daliushu Dam-site in Heishan Gorge of Yellow River and Estimation of Ground Rupture Risk;
黄河黑山峡大柳树坝址区地应力模拟计算及破裂危险性评价
5)  Daliushudam site
大柳树坝址区
6)  high earth-rock dam
高土石坝
1.
Effect of geomembrane and core-wall united impervious system on arch effect of core-wall in high earth-rock dams;
膜土联合防渗系统对高土石坝心墙拱效应的影响
2.
Nonlinear analysis of slope stability for high earth-rock dams;
高土石坝坝坡稳定非线性分析
3.
Research on slope seismic stability analysis of high earth-rock dams;
高土石坝坝坡抗震稳定分析的研究
补充资料:土石坝
      土坝和堆石坝的统称。又称当地材料坝。土坝和堆石坝都是传统坝型,历史悠久,使用较为普遍,至19世纪已具有较高水平,最大高度已达50m。及至20世纪,特别是50~60年代,由于土石的施工技术发展,大型碾压设备如重型夯板、振动碾等的出现,各种粒径的石碴和块石可以和土、砂、砂砾等一样地进行碾压,因此土石坝得到了很大的发展。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条