1) Dalong Earth-rock Fill Dam
大隆土石坝
2) Daliushu earth-rockfill dam
大柳树高土石坝
3) first chop large scale earth and rockfill dam
一级大型土石坝
1.
According to "Standard for Classification and Flood Control of Water Resources and Hydroelectric Projects"(SL252-2000) and "Classification & Design Safety Standard of Hydropower Projects"(DL5180-2003), the standard of Spillway Design Flood for first chop large scale earth and rockfill dam must be Probable Maximum Flood, or recurrence interval of ten thousand years.
根据《水利水电工程等级划分及洪水标准》SL252—2000和《水电枢纽工程等级划分及设计安全标准》DL5180—2003中的规定,对于一级大型土石坝,应以可能最大洪水(PMF)或重现期10000年作为校核洪水标准。
4) embankment dam
土石坝
1.
Application of low elastic modulus concrete anti-seepage wall in embankment dams;
低弹模混凝土防渗墙在土石坝工程中的应用
2.
CDesign and construction of composite geomembrane in tilting core embankment dams;
土石坝复合土工膜防渗斜墙的施工设计
5) high earth-rock dam
高土石坝
1.
Effect of geomembrane and core-wall united impervious system on arch effect of core-wall in high earth-rock dams;
膜土联合防渗系统对高土石坝心墙拱效应的影响
2.
Nonlinear analysis of slope stability for high earth-rock dams;
高土石坝坝坡稳定非线性分析
3.
Research on slope seismic stability analysis of high earth-rock dams;
高土石坝坝坡抗震稳定分析的研究
6) earth-rock dam
土石坝
1.
Dynamical response analysis of the earth-rock dam on soft soil during earthquake;
地震力作用下软基土石坝的动力响应分析
2.
Cause of seepage of earth-rock dam in Yunnan Province and treatment;
云南省小型病险水库土石坝渗漏成因及防渗处理
3.
Application of resistivity tomography nondestructive detection technique to earth-rock dam for Longfengshan Reservoir;
龙凤山水库土石坝电阻率层析成像无损检测技术
补充资料:土石坝
土坝和堆石坝的统称。又称当地材料坝。土坝和堆石坝都是传统坝型,历史悠久,使用较为普遍,至19世纪已具有较高水平,最大高度已达50m。及至20世纪,特别是50~60年代,由于土石的施工技术发展,大型碾压设备如重型夯板、振动碾等的出现,各种粒径的石碴和块石可以和土、砂、砂砾等一样地进行碾压,因此土石坝得到了很大的发展。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条