1) checking platform
考核平台
1.
Realization and design of checking platform for course of structure based on network environment;
基于网络环境下的结构类课程考核平台的设计与实现
2) checking condition of transformer and substation
台区考核
1.
According to the actual condition of line losses management in Jilin province, the design scheme was put forward, which combined together with line losses management, theoretical calculation and checking condition of transformer and substation.
针对吉林省线损管理的实际情况,提出了一套把线损管理、理论计算和台区考核有机地结合在一起的设计方案。
3) examination platform
考试平台
1.
Design of Network Examination Platform Based on Campus Network;
基于校园网的网络考试平台设计
2.
In this paper,currently examination platform’s shortcomings are discussed.
本文通过对现有考试平台系统缺点的分析,提出了一种基于WEB的考试平台系统的设计方案,该系统具有较好的可靠性,安全性和可维护性。
4) test platform
考试平台
1.
Based on the traditional test platform,the paper takes advantage of Visual C++6.
在传统的开放式考试平台的基础上,利用Visual C++6。
5) checkout level
考核水平
1.
On the basis of the consideration to the influencing factors for the checkout levels of the public examination papers, constructed is its fuzzy synthetical assessment model by the fuzzy mathematical method.
在考虑试卷考核水平影响因素的基础上,应用模糊数学方法建立了试卷考核水平的模糊综合评判模型,运用该模型对我院大学物理统考考核水平的实际结果进行了综合评价,获得了较为合理的结果。
6) check at ordinary times
平时考核
补充资料:成本考核指标(costexammingtarget)
评价各成本中心业绩的主要依据。通过考核,可以促使各个责任中心控制和降低各项耗费,以便控制和降低各种产品的生产成本,成本考核指标主要集中于目标成本的完成情况,包括目标成本节约额是一个绝对数指标,它以绝对数来反映目标成本的完成情况,其计算公式如下:
目标成本节约额=预算成本-实际成本
目标成本节约率是一个相对数的指标,它以相对数的形式反映目标成本的完成情况。
目标成本节约额=预算成本-实际成本
目标成本节约率是一个相对数的指标,它以相对数的形式反映目标成本的完成情况。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条