说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 双层拱坝
1)  double-tiered arch dam
双层拱坝
1.
Design and construction of crack grouting-blocking of the Bobai Huojia reservoir double-tiered arch dam;
火甲水库双层拱坝裂缝封堵灌浆设计与施工
2)  hyperbolic arch dam
双曲拱坝
1.
Construction technology of masonry hyperbolic arch dam;
浆砌石双曲拱坝施工技术
2.
This paper carries on the statistics of extreme value in the bias field and the stress field and analyzes sickness danger reason of lays with the mortar stone hyperbolic arch dam.
基于邓肯—张(Duncan and Zhang)非线性模型的三维有限元理论,采用有限元法计算拱坝在各种工况下的位移场及应力场,对位移场及应力场中的极值进行统计,分析浆砌石双曲拱坝的病险原因。
3.
A complete and effective technological system for the hyperbolic arch dam con-struction including establishing a control network for construction, setting and calculatingthe coordinates of setting-put point and setting-out survey, was proposed- The constructionprecision is increased by controling the shape of hyperbolic arch dam.
从建立施工控制网、设置计算放样点坐标和施工放城点测量方面建立了一个完整、有效的双曲拱坝体型施工控制技术体系,从而提高了施工精度,解决了双曲拱坝体型控制的难题。
3)  double-curvature arch dam
双曲拱坝
1.
RCC construction techniques of the double-curvature arch dam for the Linhekou Hydropower Station in Shaanxi;
蔺河口水电站双曲拱坝碾压混凝土施工技术
2.
Discussion on concrete temperature control and crack control of Zhougongzhai double-curvature arch dam
周公宅水库双曲拱坝混凝土温度控制及防裂措施探讨
3.
With the example of Zhaolaihe double-curvature arch dam framework design with characteristics of big curvature,big overhanging angle and big height,this paper describes the continuous climbing formwork system applicable to the construction and continuous rising of big double-curvature RCC dam.
结合具有曲率大、倒悬度大及高度高等特点的招徕河双曲拱坝模板规划设计这一工程实例,研制出一套适用于大曲率碾压混凝土双曲拱坝施工连续上升的模板体系。
4)  arch dam
双曲拱坝
1.
Hydropower arch dam foundation excavation and processing design of Ying Yue Tan;
映月潭水电站双曲拱坝基础处理设计
2.
Design height of Niutoushan arch dam is 108m, which is located on the v-shaped river valley, favorable for building arch dam.
牛头山水电站双曲拱坝设计坝高108m,其坝址河谷呈V形,有良好的建坝条件,但基础左坝肩、右坝肩均存在断层和深部裂隙等地质缺陷,成为工程的隐患。
5)  double curvature arch dam
双曲拱坝
1.
Stress analysis of double curvature arch dam with upper outlet, horizontal beam and pier;
坝顶开孔的双曲拱坝设置水平梁和闸墩的应力分析
2.
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.
阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
3.
The Laxiwa double curvature arch dam,with the maximum dam height of 250 meters,is located in an area with strong seismic activity.
拉西瓦双曲拱坝最大坝高250m,坝址所处地区地震活动性强,为此,根据DL5073—2000《水工建筑物抗震设计规范》的原则、方法和要求,在考虑地形地质条件、地基辐射阻尼及横缝非线性影响的条件下,采用三维有限元法对大坝及其基础进行动、静力分析,并用水弹性模型试验进行验证,综合分析评价了大坝抗震安全性能。
6)  double-curved arch dam
双曲拱坝
1.
The sliding stability of the abutments of Jiangpinghe double-curved arch dam is analyzed by 3-D nonlinear FEM with strength safety coefficient.
采用三维有限元方法,用强度储备系数,对江坪河双曲拱坝坝肩抗滑稳定性进行分析。
2.
Considering the construction work of Dongping concrete double-curved arch dam is high intensive and pressed for time, a number of new technologies about formwork, reinforcement processing, concrete placing, temperature control etc.
针对洞坪工程混凝土双曲拱坝施工强度大、工期紧、技术与质量要求高、温度控制严等特点,在施工中对模板、钢筋、混凝土浇筑、温度控制等方面采用新工艺、新技术,为确保拱坝的混凝土浇筑质量和快速施工提供了保障。
3.
Thus, fine quality of the double-curved arch dam is gained.
恩施州水电监理咨询有限公司芭蕉河监理部在芭蕉河二级水电站浆砌石双曲拱坝施工质量控制过程中,始终坚持质量第一的原则,推行规范化、科学化、程序化的管理模式,建立、健全质量保证体系,重视原材料、半成品、成品的检验和跟踪监控,确保了优良的施工质量。
补充资料:拱坝应力分析


拱坝应力分析
stress analysis of arch dam

  gongba yingli fenxi拱坝应力分析(stress analysis of arehdam)研究拱坝坝体和地基在各种荷载作用下的应力和变形的方法。在拱坝设计中,拱坝体形和厚度的选择,混凝土标号及地基软弱部位的加固等,均须参照应力分析的结果来确定。拱坝的应力分析,包括数学分析、结构模型试验和原型观测。原型观测是在已建成的坝上进行观测,了解其工作安全状况,校验设计结果,并为以后的科学研究提供资料。 拱坝由于结构复杂,小型工程可采用拱冠梁法。对于大型工程,过去多采用拱梁试(分)载法和结构模型试验。薄拱坝有采用有限差分法的。20世纪70年代起,逐渐采用有限单元法。 为了统一标准,在规定最大设计应力的同时,须规定应力分析方法。因拱坝的应力分布和最大拉、压应力,常随分析方法而改变。考虑各国已建成的大型拱坝都有拱梁试(分)载法的计算结果,拱坝应力分析如采用拱梁试(分)载法,可与已建拱坝进行对比,便于作出安全的评价。 拱梁试(分)载法将空间壳体化为杆系来计算,力学概念明晰,在计算过程中,能逐渐了解其力学机理,便于修改体形和调整厚度,但只能算出坝体应力。在分析地震反应、孔口影响及地基不均匀性等方面,不如有限单元法好。目前,国内外均有拱梁试(分)载法和有限单元法的通用程序。一些大型拱坝设计,常同时采用这两种方法,有时还辅以结构模型试验。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条