1)  broken-up and hanging
解体吊装
2)  integral hoisting
整体吊装
1.
The techniques of integral hoisting of the super steel cofferdam is adopted in No.
苏通大桥主桥6、7、8号墩的特大型钢吊箱采用整体吊装施工工艺。
2.
The selection and integral hoisting of water tower with large capacity are also discussed.
对8度震区内800m3倒锥壳保温水塔的受力特点和抗震设计进行了比较详细的分析,提出了支承筒与水柜间先进简捷的连接方式,从而增加了水塔的有效容积,缩小了水柜直径,节省投资,并对大容积水塔的选型和整体吊装施工工艺进行了剖析和探讨。
3.
Solutions were adopted aiming to several characteristics including accurate location of construction steel box, integral hoisting (with 190 t total weight) and difficult organization.
介绍了针对施工钢套箱准确就位、钢套箱整体吊装(总重量为190t)和施工组织难度大等特点采取的应对措施。
3)  integral lifting
整体吊装
1.
Method and characteristics of integral lifting of axial flow Kaplan runners;
轴流转桨式水轮机转轮整体吊装的方法和特点
2.
On the integral lifting construction technique of the arch leaf for the concrete filled steel tube's arch
钢管混凝土拱桥拱片整体吊装施工技术
3.
The construction technique for high altitude integral lifting of large front support point form travelers by use of simple horizontal hanger frame is introduced,through comparison of construction technique of large form travelers of two cable-stayed bridges(Chongqing Fengjie Yangtse River Bridge and Pengxi River Bridge on Chongqing Yunwan Expressway).
通过重庆奉节长江大桥及重庆云万高速公路彭溪河特大桥两座斜拉桥挂篮吊装施工的对比,主要介绍了利用简易水平吊架进行大型前支点挂篮高空整体吊装的施工技术。
4)  integral lifting and installation
整体吊装
1.
This paper introduces the construction scheme adopted for the integral lifting and installation of guyed form traveler for the main girder atop pier No.
介绍忠县长江公路大桥11号墩主梁牵索挂篮采用的整体吊装施工方案。
2.
0,the rest parts of the girder of the bridge are constructed by the front-support form travelers and the construction technology for the integral lifting and installation of the travelers is presented.
丰城剑邑大桥主桥为(55+2×165+55)m单塔双索面斜拉桥与悬臂梁桥协作体系结构,除0号块前3段梁段外,其余梁段采用前支点挂篮施工,介绍挂篮整体吊装施工工艺。
5)  Barrel hoisting
筒体吊装
6)  whole erection
整体吊装
1.
Construction technology for whole erection of large span truss;
大跨度桁架整体吊装施工技术
2.
The rope system “double-crane and five-hoist-point-”for the whole erection of the large-scale slender R.
)柱整体吊装“双机五点吊”绳系方案的最优绳系型式、最优吊点位置、最优绳元高度 (对应最优绳长 ) ,以解决大中型火电厂的大型细长钢筋混凝土柱整体吊装问题 。
补充资料:厂房钢结构组合吊装


厂房钢结构组合吊装
combined hoisting of steel structure for workshop building

  采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。