1) lifting of ship block
船体分段吊装
2) segmental hoisting
分段吊装
1.
Steel tubular arch bridge has a large stiffness in the finished dead state, but in the construction stage, especially at the stage of cable segmental hoisting, its stiffness is very small, and changes with construction.
钢管混凝土拱桥在成桥状态下刚度比较大,但是在施工阶段,尤其是采用缆索分段吊装施工时,刚度较小,而且随施工阶段不断变化。
3) ship structure
船体分段
1.
Deformations of a welded ship structure will reduce the structure strength.
船体分段在焊接过程中产生的焊接变形会使船体结构强度降低,精确预测和控制焊接变形是现代造船工艺的要求。
2.
Deformations of a welded ship structure injure the beauty of appearance of a structure and cause errors during the assembly of the structure.
船体分段在焊接过程中产生的焊接变形会给下一阶段的焊接和装配带来很大的困难,甚至使船体结构强度降低,在分段合拢时,需花大量的时间进行矫正和铲割工作,这必然影响建造进度和经济效益。
4) body section
船体分段
1.
The quadratic programming model and its solution for the minimum cost of body section
船体分段制造最低成本的二次规划模型及其求解
5) ship block
船体分段
1.
In South Korea, the total ring block construction method was implemented, the total block was giant (about 3000t), but the largest ship block is not more than 1000t in our country.
本文借助计算机辅助设计,采用三维虚拟仿真技术对船体分段自动合拢设备机械结构模型进行了初步的研究探讨。
6) prefabrication
[英]['pri:,fæbri'keiʃən] [美][pri,fæbrə'keʃən]
预制分段船体的装配
补充资料:厂房钢结构组合吊装
厂房钢结构组合吊装
combined hoisting of steel structure for workshop building
采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条