说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 后浇缝
1)  after-pouring of concrete into construction joint
后浇缝
1.
A better method-after-pouring of concrete into construction joint-is put forward.
本文通过对工程实践的总结和分析,指出了以往解决高层建筑中主楼与裙房基础差异沉降的传统方法的弊端,提出了一种较好的解决方法后浇缝法,并简述了其基本原理、基本施工程序及适用范围。
2)  post-grouting fake crack
后浇假缝
1.
The techniques adopted include UEA concrete expansive agent mixing, external waterproof coating and four-sections constructing, furthermore, "post-grouting fake cracks" have been settled between different sections by which post-grouting belts are cancelled, thus the constructing was accelerated, and perfect waterproofing effect is achieved as a result.
即掺UEA混凝土膨胀剂,外涂防水基,分四段施工,施工段之间设"后浇假缝",取消后浇带,加快了施工进度,获得了良好的防水效果。
3)  after-pouring joint construction
后浇缝施工
1.
Comparison between after-pouring joint construction and nonjoint construction method;
后浇缝施工和无缝施工方法的比较与认识
4)  post-poured joint
后浇缝结构
1.
This paper introduces the different kinds of post-poured joints as well as their functions, treatment methods and construction operations.
分析了不同种类后浇缝的设置原因 ,介绍了后浇缝结构的形式以及后浇缝的有关施工环节 ,指出在施工过程中必须合理设置、正确施工 ,才能保证工程质量 ,达到预期效
5)  intervals of post-concreting-joint
后浇缝间距
6)  pouring crack
浇缝
补充资料:212113浇冒口清理滚筒操作规程
生产率:5吨/时
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、 检查滚筒内部锰钢板是否松动、如有松动,应及时紧固好;
b、 检查滚筒体入口处是否与滑道相碰,如果相碰应于脱开;
c、 先点动试车,然后空运转2-3分钟,检查传动系统(电动机、联轴节、减速器)和滚筒体的运动是否平稳,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、 开车时,先开通风机,后开滚筒。停车时,先停滚筒,后停通风机;
b、 经常注意进料情况,过宽过长的料不得进入滚筒内,以免卡住滚筒,使得滚筒体撬起,甩到地坑内,造成设备事故;
c、 滚筒进料时,操作人员不要在地坑内停留;
d、 设备开动时,如果滚筒压在挡轮上,应通知维修人员调整,以免引起轴瓦发热,甚至烧坏轴瓦;
e、 不许浇冒口积压在滚筒出口处,以免妨障滚筒体动动。
4、工作后滚筒体内的浇冒口应完全卸尽。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条