1) late poured band
后浇带
1.
Plugging reinforcing construction technology of the late poured band in the basement;
地下室后浇带堵漏补强施工技术
2.
Analysis on the structural late poured band design and the construction quality control;
浅析结构后浇带设计和施工质量控制
3.
On the construction of concrete late poured band of multilayer architecture;
谈多层建筑混凝土后浇带的施工
3) post-pouring strip
后浇带
1.
Influencing of installation of post-pouring strip to anti-crack;
后浇带设置对抗裂效果的影响
2.
Construction of post-pouring strip of Shanxi agricultural technique service station;
山西省农业技术综合服务基地工程后浇带施工
4) post-pouring belt
后浇带
1.
The designer can set post-pouring belt,using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.
超长混凝土结构的设计和施工中可以采取设置后浇带、采用微膨胀——补偿收缩混凝土或设计无粘结预应力混凝士结构来防止温度收缩裂缝的产生。
2.
Authors also advise the design and construction about the anti-crack and anti-seepage of basement from some aspects,such as post-pouring belt,steel reinforcement,concrete,waterproofing materials.
结合多项大型地下室工程实践和试验研究,从设计、材料、施工3个方面分析了地下室开裂及渗漏的原因,提出了关于地下室结构后浇带、钢筋、混凝土、防水材料等方面抗裂防渗的设计和构造,并阐述了抗裂防渗高性能混凝土的试验研究和配制原则,以及地下室抗裂防渗的关键施工技术。
5) post-poured strip
后浇带
1.
Analysis of effect of post-poured strip applying in cracks prevention of gate frusta;
设置后浇带对闸墩结构的抗裂作用分析
2.
Treating some common problems in the post-poured strip construction process combined with design;
结合设计处理好后浇带施工过程中的常见问题
3.
Brief analysis of influence of post-poured strips on thermal stresses in concrete main power building for 600MW unit
后浇带对600MW机组混凝土主厂房温度应力影响浅析
6) embedded joint
后浇带
1.
In accordance with related rules and regulations, the article combines with practical engineering to point out the common problems in presetting embedded joint and hereby propose corresponding solutions.
文章结合工程案例,依据相关规范要求,对后浇带留设问题进行探讨,指出其施工中存在的质量通病并提出相应的解决措施。
2.
It is a common practice to set embedded joint in the construction of mass concrete structure.
在钢筋混凝土结构中设置后浇带是目前常采用的一种方法。
3.
The article mainly states the function, category and constructional methods of embedded joint for high-rise building with podium and then puts forward the precautious and control measures in the design and construction of the embedded joint.
文章重点论述带裙房高层混凝土建筑后浇带的作用、分类和构造做法,以及设计施工中应注意的事项和宜采取的措施。
补充资料:板带轧制速度规程(见板带轧制规程设计)
板带轧制速度规程(见板带轧制规程设计)
speed schedule for plate and strip rolling
bandai zhazhi sudu guieheng板带轧制速度规程(speed seheduxe fo:plateand strip rolling)见板带札制规程设计。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条