说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 河道围堰
1)  riverway cofferdam
河道围堰
1.
The reinforced earth retaining wall is widely applied to the engineering practice,but it is less done to harnessing riverway cofferdam.
加筋土挡墙被广泛应用于工程实践中,但目前用于河道围堰整治较少。
2)  first-stage cofferdam's reach
一期围堰河段
3)  cofferdam [英]['kɔfədæm]  [美]['kɔfɚ,dæm]
围堰
1.
Experimental study on the concrete properties in cut-off wall of the earth-rock cofferdam;
土石围堰防渗墙混凝土性能试验研究
2.
Structure design of Donghu tunnel steel sheet pile cofferdam;
东湖隧道钢板桩围堰结构设计
3.
Application of geomembrane to cofferdam of Langshitan Hydropower Station;
土工膜在浪石滩电站围堰工程中的应用
4)  coffer [英]['kɔfə(r)]  [美]['kɔfɚ]
围堰
1.
Design & construction of steel board pile coffer of low pile platform in sandy land;
砂滩地低桩承台的钢板桩围堰设计与施工
2.
The construction technique and process of single wall steel coffer ringlike bot-tom concrete pavement under deep water,under the geological condition of shallow soil coveringlayer,are introduced,which is a good reference to other construction companies.
在水下覆盖层较浅的地质条件下,采用了单壁钢围堰深水环形水下混凝土封底技术,详细介绍了有关工艺和施工过程,可供施工单位借鉴。
5)  coffer dam
围堰
1.
Application of the civil structure coffer dam in construction and diversion project;
土木结构围堰在施工导流工程中的应用
2.
The stress state and seepage of anti-seepage walls under longitudinal RCC coffer dam of Linkuhydropower station are studied using 2D non-linear finite element method.
采用二维非线性有限元分析方法,研究了六库水电站RCC纵向围堰防渗墙的防渗效果和应力应变状态。
3.
During the design of the Jilin Tai construction conduction and damming current,the bank slope complete rock and the coffer dam union was fully used,reduced the coffer dam seep,obtained some economic efficiency; Simultaneously used the prominent rock to make T-shaped dam,damming current difficulty was reduced.
为了使吉林台水电站施工导截流顺利进行,在吉林台施工导截流设计中,充分利用了岸坡完整岩体与围堰结合,降低了围堰渗水,同时利用突出岩体做成"丁"字坝,减小了截流难度,取得了一定的经济效益和良好的施工效果。
6)  cofferdams
围堰
1.
Study of electric energy influenced by tail race river narrowed by cofferdams;
围堰束窄河道对发电影响的研究
2.
Discusses the optimizing process of treatments of the main technical problems,which include the construction schedule, the field plan and the balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construction of the cut-off wall
论述了三峡大江截流及二期围堰实施过程中的施工进度计划、料场规划与土石方平衡、截流方式与围堰断面形式、截流进占程序和时段、防渗形式、防渗墙施工等主要技术问题的优化完善过
3.
The cut off wall of the second stage cofferdams of the Three Gorges Project has a maximum height of 74?m, a thickness of 0 8~1 1?m,and a total seepage proof area of 83?450?m 2 .
三峡二期围堰防渗墙最大高度 74m ,墙厚 0 。
补充资料:河道洪水演进(见河道洪水演算法)


河道洪水演进(见河道洪水演算法)


neaao non郎hUi河道洪水演进yanJ县n 见河道洪水演算法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条