说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 一期围堰河段
1.
Backwater Effects of Inflow from Hengjiang River in Flood Period on the Water Level in the First-stage Cofferdam's Reach of the Xiangjiaba Project
汛期横江入流对向家坝一期围堰河段水位的顶托影响
2.
Construction Technology for Large Double Wall Steel Cofferdam in Strong Bore Section
强涌潮河段大型双壁钢围堰施工技术
3.
Experimental Research on Cofferdam Effects on the River Reach in a Stage Diversion
分期导流围堰对河道水流影响的试验研究
4.
Construction of Steel-plate Pile Cofferdam for Taidong River Bridge in No.204 National Highway
204国道泰东河大桥钢板桩围堰施工
5.
Test Research about the Cofferdam Anti-seepage Scheme at Jiangpinghe Hydroelectric Power Station
江坪河水电站围堰防渗方案试验研究
6.
Finite Element Analysis of the Steel Sheet Cofferdam for the Kuaihe Mega Bridge
浍河特大桥钢板桩围堰的有限元分析
7.
Successful experiences in blasting demolition of an underwater cofferdam of Dayuandu power station is introduced briefly, which are useful for the designing other similar blasting demolition project.
介绍了大源渡航电枢纽工程河中混凝土纵向围堰上游连接段水下拆除爆破的成功经验。
8.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究
9.
The Application of Pile-membrane Cofferdam on Bei Yunhe Synthesized Alteration Engineering;
桩膜复合围堰在北运河综合治理工程中的应用
10.
Initial analysis on anti-seepage project construction of the earth-rork cofferdam in the Shuhe hydropower station
蜀河水电站土石围堰防渗工程施工浅析
11.
Manufacturing and Corrosion Protection of Steel Cofferdams for Dagu River Shipping Channel Bridge of Qingdao Bay Bridge
青岛海湾大桥大沽河航道桥钢围堰加工与防腐
12.
Application of the Larssen Steel Sheet Cofferdam to the Construction of the Haihe River Mega Bridge
拉森钢板桩围堰在海河特大桥施工中的应用
13.
Application of Cofferdam of Steel Plate in Construction of Water-Way Deep Ditch
钢板桩围堰在河道深基坑施工中的应用
14.
Use of Steel Sheet Pile Cofferdam in Deep-water Foundation of the Qinhuaihe Megabridge
钢板桩围堰在秦淮河特大桥深水基础中的应用
15.
On the design of integrated steel hang box cofferdam and its construction technology on Shangtang river
上塘河主墩承台整体式钢吊箱围堰设计与施工
16.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
17.
Experiment on discharge distribution around cofferdam section in a stage diversion
分期导流围堰进口断面的流量重分配试验
18.
Application of modified D-P model to analysis of the second stage cofferdam in Three Gorges Project
修正D-P模型在三峡二期围堰分析中的应用