1) dam core impervious material
大坝心墙防渗掺合料
1.
Qualified dam core impervious material is produced by controlling four key procedures during material mixing.
大坝心墙防渗掺合料的生产质量是狮泉河水电站大坝质量控制的关键。
3) dyke anti seepage core wall
堤坝防渗心墙
1.
In this paper, via the numerical method, we carried out the theoretical simulation of the CSAMT response of the dyke anti seepage core wall.
本文通过数值方法 ,进行了堤坝防渗心墙CSAMT响应的理论模拟。
4) impervious soil materials for the core wall
心墙防渗土料
1.
This paper presents the results of a great deal of tests, which show that the impervious soil materials for the core wall of the dam of “635” water control project are either nondispersive soil or transitional soil.
通过大量试验分析 ,鉴定“6 35”大坝心墙防渗土料分别为非分散性土和过渡性土 ,并针对其存在的潜在分散性进行了多方案的改性试验研究 ,为认识和解决土料分散性工程问题提供了全面、可靠的科学依据。
5) impermeable wall of dam
堤坝防渗墙
补充资料:防合
1.官名。南北朝时朝廷禁卫武官置直阁将军﹐诸王﹑都督﹑刺史置防阁将军﹐以勇略之士充任﹐以防卫斋阁。唐制﹐亲王以及京师文武执事官五品以上皆有防阁﹐州县称白直。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条