1.
Monitoring and Analysis of Cut-off Wall of Yanshan Reservoir in Construction Period
燕山水库大坝防渗墙施工期监测分析
2.
The Construction and Quality Control of Concrete Cut-off Wall of Dam at Yele Hydropower Station;
冶勒水电站大坝防渗墙施工与质量控制
3.
DESIGN KEY OF THE CONCRETE CUTOFF WALL IN STRENGTHENING THE DAMS OF DANGEROUS RESERVOIRS
病险水库大坝防渗加固砼防渗墙设计要点
4.
Seepage Control and Numerical Analysis of Daxigou Asphalt Core Rockfill Dam
大西沟沥青心墙坝防渗处理和渗流分析
5.
Data analysis on impervious wall under construction of Renzonghai hydropower station
仁宗海水库大坝坝基防渗墙在坝体填筑期间的监测资料分析
6.
Investigalion of stress and seepage stability at the conjoined section of concrete diaphragm and core of roekfill dam
大坝心墙插有混凝土防渗墙段的应力与渗透稳定性试验研究
7.
Experimental study on high performance concrete for core wall of earth dam
大坝防渗心墙高性能混凝土的试验研究及应用
8.
Application of plastic concrete cut-off wall of a dam
塑性混凝土防渗墙在某水库大坝中的应用
9.
Application of gravelly soil to the impervious core of the dam for Xijinghe Reservoir
砾质土料在西静河水库大坝防渗心墙中的应用
10.
Dispersion appraisal and modification analyses of the impervious soil materials for the core wall of the dam of “635” water control project
“635”水利枢纽大坝心墙防渗土料分散性鉴定及改性试验研究
11.
Quality Control for Dam Impervious Core Material Mixing at Shiquanhe Hydropower Project
狮泉河水电站大坝心墙防渗掺合料生产质量控制技术
12.
Anti-seepage technique for sand-gravel dam with compound geomembrane inclined wall of Xixiayuan Counter Reservoir
西霞院反调节水库复合土工膜斜墙砂砾石大坝防渗施工技术
13.
Treatment measures for main dam concrete anti-seepage wall construction platform collapse and guide slot settlement at a reservoir
某水库大坝砼防渗墙施工平台坍陷及导向槽沉降处理措施
14.
Application of Double-pump Large Flow Vibrating Boring and High-pressure Jet Grouting Cut-off Wall in Fine Silt Dam
双泵大流量振孔高压旋喷防渗墙在粉细砂坝中的应用
15.
Analysis on monitoring data of cut-off wall of auxiliary dam at Huangbizhuang reservoir
黄壁庄水库副坝防渗墙监测资料分析
16.
Construction of impervious wall in CFRD of Laodukou Hydropower Station
老渡口水电站面板堆石坝防渗墙施工
17.
Seepage and Seepage Stability Analysis of Dam Foundation Cut-off Wall and Grout Curtain under Cut-off Wall
坝基防渗墙及墙下灌浆帷幕渗流及渗透稳定性分析
18.
Effects of cracking of anti-seepage concrete wall on seepage stability of dam foundation
混凝土防渗墙开裂对坝基渗透稳定性的影响