1)  anchor-pile loading test
锚桩法
1.
Interaction and error analysis of pile groups in anchor-pile loading test;
锚桩法单桩静载试验中群桩相互作用及误差分析
2)  anchor pile
锚桩
1.
Study on optimization of anchor pile spacing for Goupitan Hydropower Station;
构皮滩水电站锚桩间距的优化研究
2.
Discussion of the anchor pile static load experimentation on the impact of anchor pile;
锚桩静载试验法考虑锚桩影响的讨论
3.
Ultimate pull bearing capacity of anchor pile on working derricks determined by mechanical impedance method;
用机械阻抗法确定作业井架地锚桩的极限承载力
3)  anchored pile
拉锚桩
4)  pile
地锚桩
1.
The truck-mounted diesel hammer pile driver is a self-moving equipment that can drive the special cement piles into the ground.
打桩时,地锚桩由液动扶桩臂夹持扶正,柴油锤利用柴油在其燃烧室内燃烧产生的能量进行打桩,整个击桩过程由柴油锤自动连续完成。
5)  the length of pile
锚桩长度
6)  space of the pile
锚桩间距
参考词条
补充资料:岩石锚桩基础


岩石锚桩基础
rock-anchor pile foundation

翼鳝蒸巍揣骗廿瓢为直接建造在鞘上的土业广触下郭以脉受较蒙耀粼翼黝…黑篙蓄粼_一姚- 径。.二-一辉_
说明:补充资料仅用于学习参考,请勿用于其它任何用途。