说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 锚桩横梁
1)  anchor pile beam
锚桩横梁
2)  anchor beam
锚固横梁
1.
In order to get its partial stress value and distribution as well as its force transfer path,prestressing tendons and main cable was simulated by spatial cable element,concrete anchor beam was simulated by 3D block element,and a 3D refinement finite element model was established with secondary development technology based on the platform of general finite element program.
为了获得锚固横梁局部应力的大小与分布规律,对其传力途径进行研究,以通用有限元程序为计算平台,采用空间索单元模拟横梁中配置的预应力束以及主缆束股,三维块体元模拟混凝土锚固横梁,应用二次开发技术,建立精细三维有限元模型。
3)  anchorage beam static pressure pile
锚梁静压桩
1.
This paper intends to introduce the operation regulations of anchorage beam static pressure pile issued by the Company itself and put forward some suggestions of how to solve the problems concerning design, construction, testing and quality inspection as well as the innovation of construction plant.
文章主要介绍苏州建院营造有限公司企业标准《锚梁静压桩操作规程》中有关设计、施工、测试质检等常见问题的认识与处理,以及技术设备的更新作了一定探讨。
4)  anchoring steel beam
锚固钢横梁
1.
The distribution of ring pre-stress, anchoring steel beam and pre-stress, vertical pre-stress of the anchoring zone of the main tower in Songhuajiang cable stayed bridge are introduced and the corresponding construction technologies are clarified in the paper.
介绍哈尔滨绕城公路松花江斜拉桥主塔锚固区环向预应力、锚固钢横梁及预应力、竖向预应力的布置情况及有关的预应力施工工艺。
5)  high-pile wharf crossbeam
高桩码头横梁
1.
Finite element analysis on ultimate bearing capacity of high-pile wharf crossbeam
高桩码头横梁极限承载力有限元分析
6)  bolt counterforce device
锚杆横梁反力装置
1.
Besides,conclusion that bolt counterforce device is only applicable for piles of small tonnage can be reached and load cell method is recommended for large tonnage.
由测试过程可以看出,锚杆横梁反力装置仅适用于岩溶地区吨位较小的试桩,对大吨位的试桩,建议采用自平衡法进行测试,充分体现了自平衡法基本不受吨位限制的优点。
2.
In this paper videotaping the property of engineering geology in karst area,a bolt counterforce device is proposed for the pile static test based on the comparative studying the accommodation of the different traditional loading test devices.
针对岩溶地区的工程地质特性,在比较传统加载试验装置的适应性基础上,提出采用锚杆横梁反力装置做桩基静载试验的方法。
补充资料:岩石锚桩基础


岩石锚桩基础
rock-anchor pile foundation

翼鳝蒸巍揣骗廿瓢为直接建造在鞘上的土业广触下郭以脉受较蒙耀粼翼黝…黑篙蓄粼_一姚- 径。.二-一辉_
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条