1) electric connection
电气接线
1.
The main electric connection schemes of 500 kV Dongguan Substation is described.
介绍了 5 0 0kV东莞变电站电气主接线 ,通过技术、经济比较 ,进行了 5 0 0kV和 2 2 0kV电气接线方案论证。
2) electrical connection
电气接线
1.
The electrical connection schemes of variable frequency speed control system were analyzed and studied.
对变频调速系统的电气接线方案进行了分析和研究,比较2种电气接线的方式后,建议采用1拖2方案。
3) main electrical wiring
电气主接线
1.
Design of main electrical wiring diagram for Baise Multipurpose Dam Project;
百色水利枢纽水电站电气主接线设计
2.
This paper performs theoretical analysis of main electrical wiring reliability calculation.
对发电厂电气主接线可靠性计算进行原理分析,利用逻辑分析和全概率公式建立电气主接线可靠性模型,进而推导出面对工程中各种复杂主接线方式的计算方法。
3.
The main electrical wiring of the Xiangtan Power Plant 2×600 MW supercritical unit has such characteristics as unit connection for generator-transformer set,generator outlet equipped with GCB,inter-bridge connected 500 kV double-circuit outlet that can be modified to 3/2 switch connection in the future;eliminating start/backup and shutdown transformers.
湘潭电厂二期扩建2×600 MW超临界机组,其电气主接线具有突出的特点:两发电机-变压器组为单元接线,发电机出口装有CCB,2回500kV出线为内桥接线,将来可以过渡到3/2开关接线;取消启/备变,也不设停机变;每台机组设1台高厂变和1台公用变,2台机组的高厂变和公用变互为备用;高厂变和公用变均改为无载调压。
4) electric main wiring
电气主接线
1.
Some technology question about electric main wiring section for the 35kV transformer substation were analyzed,The article were separated into electric main wiring forms and transformer two parts,in which there are ture examples.
本文就35K及以下变电站电气主接线一次部分有关的技术问题进行分析,主要从主接线接线形式和变压器的选择两方面展开论述并辅以实例。
2.
According to the actual situation of the Nada 1st step hydropower station of Longlin county, by technical and economic check and illustration of several schemes, selected the appropriate link way for electric main wiring and service power sources.
根据隆林县那达一级电站的实际情况,通过多方案的技术经济比较进行论证,选择较为合适的电气主接线和厂用电源的引接方式。
3.
Selecting the electric main wiring plan has very important sense to the electric part design of the hydropower station,and in the key link of the electric part design of the hydropower station.
电气主接线方案的选定 ,对水电站电气部分设计具有非常重要的意义 ,是水电站电气部分设计的重要环节。
5) bus arrangement
电气主接线
1.
Reliability evaluation on the bus arrangement of the traction power supply substation has been done in the paper, based on the least cut-set approach, the reliability and the economics have been researched.
以某客运专线的牵引变电所主接线为例,对电气主接线中元件的实际运行状态进行分析,利用Java程序开发出的最小割集程序分别对无桥式、内桥式、外桥式等3种方案进行评估和比较,得出其可靠性和经济性指标。
2.
To consider the impact of bus arrangement in evaluation of the reliability of transmission network,a quantitative assessment software package of power supply reliability for transmission network including the bus arrangement is developed based on power system reliability theory,graph theory and Object Oriented Program(OOP) technology.
变电站主接线的可靠性对电力系统有着重要的影响,为了便于在输电网供电可靠性分析计算中计及变电站电气主接线的影响,在综合应用电力系统可靠性理论、图论和面向对象的计算机技术的基础上,研究开发了用于定量评估计及变电站电气主接线影响的输电网可靠性的软件包系统。
6) main electrical connection
电气主接线
1.
Reliability Assessment of Main Electrical Connections for Substation;
变电所电气主接线可靠性评估
2.
Analysis on main electrical connection reform of Gaobazhou Hydropower Plant
高坝洲电厂电气主接线改造分析
3.
According to the object-oriented methodology, the implementation of main electrical connection editor based on C+ + language is discussed emphatically.
着重讨论了面向对象的方法在电气主接线编辑器开发中的应用。
补充资料:《比利时皇家电气专家协会通报电气评论》
《比利时皇家电气专家协会通报电气评论》
Bulletion de la Société Royale Beige des Electriciens avec Revue E
Bll一shi HuangjlaD旧nq一ZhuanjlaX一ehu一TongbaoD一onqlP inglun《比利时皇家电气专家协会通报电气评论》(B以let加de la Soc心乏尺刃以‘及才g‘己云‘E距以”必奋nsavecRevueE.)创刊于1885年,法文季刊,12开本,由比利时皇家电气专家协会编辑出版。编辑部地址:比利时,布普塞尔,Boulevard BrandWithlock 114 Btes,1200。 该刊是比利时皇家电气专家协会的通报,并附有“电气评论”,主要刊载核能、人工智能、电信网络等电子、电工领域的科技论文、科技简讯和会议动态。以法文和弗兰芒文对照出版。 该刊的读者对象是电子、电工部门的科技人员。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条