1)  500 kV main electrical connections
500kV电气主接线
2)  main electrical wiring
电气主接线
1.
Design of main electrical wiring diagram for Baise Multipurpose Dam Project;
百色水利枢纽水电站电气主接线设计
2.
This paper performs theoretical analysis of main electrical wiring reliability calculation.
对发电厂电气主接线可靠性计算进行原理分析,利用逻辑分析和全概率公式建立电气主接线可靠性模型,进而推导出面对工程中各种复杂主接线方式的计算方法。
3.
The main electrical wiring of the Xiangtan Power Plant 2×600 MW supercritical unit has such characteristics as unit connection for generator-transformer set,generator outlet equipped with GCB,inter-bridge connected 500 kV double-circuit outlet that can be modified to 3/2 switch connection in the future;eliminating start/backup and shutdown transformers.
湘潭电厂二期扩建2×600 MW超临界机组,其电气主接线具有突出的特点:两发电机-变压器组为单元接线,发电机出口装有CCB,2回500kV出线为内桥接线,将来可以过渡到3/2开关接线;取消启/备变,也不设停机变;每台机组设1台高厂变和1台公用变,2台机组的高厂变和公用变互为备用;高厂变和公用变均改为无载调压。
3)  electric main wiring
电气主接线
1.
Some technology question about electric main wiring section for the 35kV transformer substation were analyzed,The article were separated into electric main wiring forms and transformer two parts,in which there are ture examples.
本文就35K及以下变电站电气主接线一次部分有关的技术问题进行分析,主要从主接线接线形式和变压器的选择两方面展开论述并辅以实例。
2.
According to the actual situation of the Nada 1st step hydropower station of Longlin county, by technical and economic check and illustration of several schemes, selected the appropriate link way for electric main wiring and service power sources.
 根据隆林县那达一级电站的实际情况,通过多方案的技术经济比较进行论证,选择较为合适的电气主接线和厂用电源的引接方式。
3.
Selecting the electric main wiring plan has very important sense to the electric part design of the hydropower station,and in the key link of the electric part design of the hydropower station.
电气主接线方案的选定 ,对水电站电气部分设计具有非常重要的意义 ,是水电站电气部分设计的重要环节。
4)  bus arrangement
电气主接线
1.
Reliability evaluation on the bus arrangement of the traction power supply substation has been done in the paper, based on the least cut-set approach, the reliability and the economics have been researched.
以某客运专线的牵引变电所主接线为例,对电气主接线中元件的实际运行状态进行分析,利用Java程序开发出的最小割集程序分别对无桥式、内桥式、外桥式等3种方案进行评估和比较,得出其可靠性和经济性指标。
2.
To consider the impact of bus arrangement in evaluation of the reliability of transmission network,a quantitative assessment software package of power supply reliability for transmission network including the bus arrangement is developed based on power system reliability theory,graph theory and Object Oriented Program(OOP) technology.
变电站主接线的可靠性对电力系统有着重要的影响,为了便于在输电网供电可靠性分析计算中计及变电站电气主接线的影响,在综合应用电力系统可靠性理论、图论和面向对象的计算机技术的基础上,研究开发了用于定量评估计及变电站电气主接线影响的输电网可靠性的软件包系统。
5)  main electrical connection
电气主接线
1.
Reliability Assessment of Main Electrical Connections for Substation;
变电所电气主接线可靠性评估
2.
Analysis on main electrical connection reform of Gaobazhou Hydropower Plant
高坝洲电厂电气主接线改造分析
3.
According to the object-oriented methodology, the implementation of main electrical connection editor based on C+ + language is discussed emphatically.
着重讨论了面向对象的方法在电气主接线编辑器开发中的应用。
6)  main electric connection
电气主接线
1.
Review on design of the main electric connection for the Sanmenxia Hydropower Station;
三门峡水电站电气主接线设计回顾
2.
Through technical and economic comparisons of the above 2 voltage grades,the main electric connection for Suzhi HPP is determined.
苏只水电站装机3台,单机容量为75MW,出线110kV和330kV两级电压,经过对该两级电压的联络方案的技术、经济比较,选定苏只电气主接线。
3.
The article introduces main electric connection,selection and arrangement of electric equipment,electric secondary equipment and lightning protection grounding design at the medium-sized draining water-logged pump station.
文章主要介绍中型排涝泵站电气主接线、电气设备选择和布置、电气二次、防雷接地设计等内容。
补充资料:安定500kV变电所


安定500kV变电所
Anding 500kV substation

器。220 kV策电装1采用剪刀式母线陈离开关配支持式铝管母线分相布t方案。支持式铝管母线系统由高强度的220 kV支柱绝像子和单根铝管母线及特殊连接金具组成,铝合金管母线外径扒30 mm,内径帆20mm,壁厚5 mm,相间距离3m,对地高度8.42m,跨度13m,每隔3跨铝管母线设1个伸缩节。220 kV配电装里间隔宽度仅为13m,纵向长度60m(主变压器22okV进线门型构架中心线至220 kV出线电容式电压互感器中心线之间的距离),占地面积15600m,。 户外同步调相机本变电所安装1台苏联进口KcB任1 60一1 syl型茸天布t的同步调相机,额定电压15.75 kV,颊定物出无功功率160 Mvar,欠励磁运行时吸收额定无功功率80 Mvar。并从苏联成套进口了启动电抗器、空气断路器、隔离开关、电压互感器及电流互感器、进贡器以及程序启动屏、励磁调节屏等电气设备。 同步调相机按苏联的典型接线进行设计、施工安装.调相机接在500 kV主变压器低压侧第三绕组15.75 kV母线上,采用电扰器降压启动的方式,启动时间约405。在同步调相机主工作回路和启动电抗器回路均安装1250oA大电流空气断路器,额定开断电流160 kA.同步调相机本体为带无刷励磁系统的氢冷三相同步调相机,低转速750r/min。利用二次循环水冷却氮气和润滑油。同步调相机本体耳天布t在1.16m高的运转平台上,同步调相机基座的下面地下一4.om设框架结构地坑,冷却同步调相机转子和定子的氢冷却系统安装在此地坑内。在相邻地下一3.om地坑内安装润滑油冷却系统和备用油箱。除了主机礴天布t在地面上以外,同步调相机的氢冷却系统、润滑油系统、压缩空气系统等均布t在地下.苏联尽天同步调相机具有单机容t大、厂房结构简单、布t十分紧凑等优点。Anding 500 kVb旧nd一ansuo安定500 kV变电所(Anding 500 kV sub-station)北京新建的500 kV大型枢纽变电所,位于北京东南郊大兴县内,是连接北京、天津、唐山500 kV电力系统的枢纽,建设规模大、出线回路数多,地位十分重要。1992年n月开始建设,1994年9月正式投入运行。 建设规模安定500 kV变电所包括500 kV、220 kV、3 5 kV和15.75 kV四级电压。500 kV和220 kV为变电所与外部电力系统连接的电压等级。35 kV和15.75kV电压等级均无出线,第一期工程安装l台160 MV·A同步调相机,采用15.75 kV电压等级。将来发展采用电容器组和电杭器组无功补偿装t,则采用35kV电压等级。 500 kV出线最终10回,第一期5回。220 kV出线最终10回,第一期7回。