说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工活动
1)  construction activities
施工活动
1.
Research on methods of managing various factors affecting construction activities and time limit responsibility with factor analysis method;
因素分析法管理多因素影响施工活动工期责任的方法研究
2)  construction live load
施工活载
1.
Based on the investigation and statistical analysis of live load during construction spot observed from Xiangyin Bridge, the chang ing law of construction live load of main beam with varied cantilever length is studied.
在对湖南湘阴湘江大桥施工期主梁施工活载现场调查统计的基础上,研究了主梁施工活载随施工节段伸长的变化规律,建立了连续梁桥主梁施工活载的随机过程模型,可供结构设计人员作施工阶段安全性验算时参考;并对今后建立更为精确合理的施工活载模型作了探讨。
3)  the implement of activity
活动实施
4)  live construction load
施工活荷载
1.
With on-site measuring data, authors used effective bearing area of members as statistical objects, calculated statistical parameters of live construction load of concrete buildings, referred domestic and foreign achievements, and provided advice about live construction load per effective bearing area of members.
通过现场实测,以构件有效承载面积为统计对象,计算得出混凝土房屋建筑施工活荷载的统计参量,并参考国内外有关成果,按构件有效承载面积,建议了施工活荷载。
5)  Dynamic construction
动态施工
1.
An analytic study of stress and displacement during dynamic construction is conducted on the immerged underground tunnel.
针对深埋地下洞室,寻求洞室动态施工中围岩应力及位移场的解析解。
2.
Based on deep foundation excavation case,this paper introduces the application of monitor and dynamic construction technology in soft soil foundation pit with internal bracing system, and it has important meaning to restrict the strain, to improve the safety of the excavation and to protect the surrounding environment.
本文将结合工程实例,阐述监测与动态施工技术在内撑式软土基坑工程中的应用,及其对于控制基坑变形,提高基坑开挖的安全及对周围环境保护的重要意义。
3.
Based on the project of expressway tunnel in Zhejiang Province,the entire dynamic construction process of the tunnel is simulated by 3-dimention finite element method with MARC software.
以浙江上三线高速公路隧道为工程背景 ,应用大型有限元软件MARC对洞口段隧道进行动态施工全过程三维有限元模拟 。
6)  construction disturbance
施工扰动
1.
Theoretical solution for consolidation of composite foundations considering construction disturbance and loading effect;
考虑施工扰动和荷载效应的复合地基固结解
2.
In this paper,on the basis of the previous researches,the concept of construction disturbance is discussed,and an expression of disturbance degree is set up and the calculation model against heave for the stability of deep excavation is established.
施工扰动的方式千变万化且错综复杂,影响到周围土体工程性质的变化。
3.
An attempt is made to express the degree of construction disturbance by the shear strain on the basis of the study of compression characteristics of soils influenced by different shear strains.
施工扰动改变了土体的应力状态和应变(位移)状态。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条