1) Zhikong Hydropower Station of Lhasa
拉萨直孔电站
1.
Successful experience in adopting the HLS60type batching plant system with connective mixers for the Zhikong Hydropower Station of Lhasa is presented.
介绍了拉萨直孔电站采用HLS60型连体式拌和楼系统的成功经验,具体包括以下几方面:(1)生产管理自动控制系统的监控;(2)机械设备的监控;(3)拌和中对质量的控制;(4)停机过程;(5)检修维护及日常保养。
2) Zhikong Hydropower Station
直孔水电站
1.
Discussions on the Problems of Loss of Field Protection of Power Generator for Zhikong Hydropower Station;
直孔水电站发电机失磁保护问题的探讨
2.
Field Laminated Assembly Technique Control of Runner s Magnetic Yoke of Tibet Zhikong Hydropower Station;
西藏直孔水电站发电机转子磁轭现场叠装工艺控制
3.
Construction Quality Control of Concrete Cut-off Wall of the Zhikong Hydropower Station;
直孔水电站混凝土防渗墙施工质量控制
3) Mollasadra Hydropower Station
伊朗莫拉萨德拉水电站
4) Lhasa site
拉萨站
5) Lasa Railway Station
拉萨车站
1.
Dupui formula? Jihaerte formula ?Kossakin formula ),confirming hydrogeological parameter and comparing them with engineering practices, carries out scientific evaluation to the water resources of proposed water source in Lasa Railway Station.
在翔实的野外勘测资料调研的基础上 ,通过运用多种水文地质计算方法 (如单位出水量 (q)法、裘布依公式、集哈尔德特公式、及库莎金公式 ) ,计算、确定水文地质参数 ,并对比分析工程实际 ,对拉萨车站拟建水源地进行了科学的水资源评
补充资料:黄河上最大的电站——龙羊峡电站
黄河上最大的电站——龙羊峡电站
黄河上最大的电站——龙羊峡电站 贺建福撮
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条