1.
During the treatment of the slope stability for the power house on the right bank of Zhikong Hydropower Station in Tibet, the steel fiber reinforced shotcrete is used for the protection of the gravel slope.
在西藏直孔水电站右岸厂房边坡稳定处理过程中,采用喷钢纤维混凝土对砂砾石坡面进行保护。
2.
The excavation of the side slope of the power house for Zhikong Hydropower Station in Tibet is restricted by a narrow construction site and a limited construction period.
西藏直孔水电站边坡石方开挖具有施工场地狭小、工期要求紧的特点。
3.
Layout Optimization of Left Bank Cutoff Wall of Laohuzui Hydropower Station in Tibet
西藏老虎嘴水电站左岸防渗墙布置方案优化
4.
Construction Technique for Large Diameter Discharging Tunnel in the Luoxidu Hydropower Plant
溪洛渡水电站大孔径排水孔施工技术
5.
Comprehensive Assessment the Risk of the Geological Disasters to the Hydropower Based on RS Technology
基于RS的西藏某水电站地质灾害危险性综合评价
6.
ANALYSIS OF THE RISK AND PREVENTION METHOD ON THE SITE OF A HYDRAULIC POWER STATION IN TIBET,CHINA
西藏某水电站厂区泥石流危险性分析与防治措施
7.
The Method of Drilling Vertical Grouting Holes of the Roller Compacted Concrete Gravity Dam of Jufudu Hydropower Project
居甫渡水电站混凝土重力坝正垂孔成孔方法
8.
Design and installation quality control of experimental tendon tension load cells at temporary bottom outlet for Laxiwa hydropower project
拉西瓦水电站泄洪临时底孔部位试验性锚索测力计设计及安装质量控制
9.
With respect to the hydropower station at Yamzhoyumco Lake, which has attracted the attention of the world, full consideration was given to the protection of the ecological environment, starting from the decision to build the station to its design and construction.
举世瞩目的西藏羊卓雍湖水电站,从项目的确定、设计到施工建设,均充分考虑了生态环境保护。
10.
Shiquanhe Hydropwer Station is located in Ngari in Tibet Autonomous Region, where the natural condition is quite serious-arcticalpine and anoxic.
狮泉河水电站工程位于西藏自治区阿里地区,高寒缺氧,自然条件极其恶劣。
11.
In accordance with local conditions, Tibet has steadfastly pressed ahead with construction of hydropower stations and worked hard to exploit geothermal energy resources and popularize the use of solar and wind energy.
西藏坚持因地制宜,积极发展水电站建设,推广利用地热能、太阳能及风能。
12.
Anti-Corrosion Study and Its Application in Yangbajain Geothermal Power Station,Tibet
西藏羊八井地热电站设备防腐研究及应用
13.
Risk assessment of the debris flow hazards around the No.2 Yanghu hydropower plant
西藏羊湖二厂电站厂房区泥石流危险性评价
14.
Summary of the Construction Technology of Tailrace System of Laxiwa Hydropower Station
拉西瓦水电站尾水系统施工技术综述
15.
Auxiliary System Design of Hydraulic Machinery for Laxiwa Hydropower Station
拉西瓦水电站水力机械辅助系统设计
16.
Application of Planting Reinforcement Bar Technique in Zhiganglaka Hydropower Station
植筋技术在直岗拉卡水电站中的应用
17.
Planning, Design and Management of Kongquegou Artificial Aggregate System of Xiaowan Hydropower Station
小湾水电站孔雀沟砂石系统的规划、设计与管理
18.
Application of Blind Hole Method and Impact Indentation Method in Residual Stress Measurement of Runner of Xiaowan Hydropower Station
盲孔法及压痕法在小湾水电站中的应用