2) in-situ observed data of a dam
大坝原型观测资料
3) observation data
观测资料
1.
Analysis on pendulum automatic observation data of Lijiaxia hydropower station;
李家峡水电站垂线自动化观测资料模型分析
2.
Back analysis of observation data of Meixi CFRD and study on prediction model for dam deformation;
梅溪水库面板堆石坝原型观测资料反馈分析及大坝变形预报模型
3.
From observation data,the paper analyzes seepage flow in the construction of Hefei Dafangying Reservoir,aiming at explaining the importance of seepage flow observation in earth-filled dam work.
渗流观测是土坝工程观测的关键,文章从施工期观测资料入手,定性分析了合肥市大房郢水库工程施工期的渗流状况,旨在说明土坝工程渗流观测的重要性。
4) observational data
观测资料
1.
The deformation is predicted by using the observational data of a flood embankment section of Hexi in Wuzhou, Guangxi.
应用灰色理论,结合工程实例,建立了马尔可夫链式灰色预测模型,利用广西梧州市河西防洪堤某堤段的水平位移观测资料,预测堤段的变形。
2.
This paper has summarised practical analysis and interpretation methods by systemically analysing the prototype seepage observational data of Huangpo Reservoir,which will be of benefit to evaluate the operation condition of earthfill dam,and reached primary seepage behaviour of reservoir.
本文通过对黄坡水库大坝的渗流观测资料进行系统的整理和分析,从实用的角度总结了渗流观测资料的整理和分析的方法,以利于对土坝的运行状况进行评价,得出了黄坡水库大坝渗流基本性状,找出了大坝存在的异常渗漏问题及渗流安全隐患,为大坝的安全运行及除险加固提供了基本资料。
3.
This article analyzes the observational data of FSQ Tiltmeter and JB Tiltmeter of HuaiBei station,makes a comparison between them combined with Rain-fall and fault ratio and concludes that FSQ Instrument’s long-term stability excels JB Instrument and they differ in the characteristics of response to frequency.
本文分析了淮北台FSQ仪和JB仪的观测数据,结合降雨资料和故障率进行对比,得到前者的长期稳定性以及观测资料内在质量优于后者,频响特性有所不同,故障率高于JB仪。
5) observed data
观测资料
1.
By use of the principles of gray relative degree and fuzzy cluster analysis, the observed data of uplift pressure at each observation points of the Xin anjiang Dam foundation are analyzed.
应用灰色关联度和模糊聚类分析原理 ,对新安江大坝坝基扬压力观测资料进行了分析 ,在分析各测点测值变化规律的基础上 ,利用同一类型的已知测点数据预测了未知测点的数据 ,为进一步分析和研究大坝的工作性态和安全监控提供了依
2.
The paper introduces the model formation method of dam observed data statistical model, based on engineering practice, a study about value deficiency influence on statistical model accuracy and the treatment method is don
介绍了大坝观测资料统计模型的建模方法 ,并结合实例 ,探讨了观测资料缺值对统计模型精度的影响及其处理的方法 。
3.
The time series method is used to extract the regular part from the residual series received by modeling of observed data.
利用时间序列方法,分析去除确定性部分后的残差序列,提取其中的有规律成分作为预报时的补偿项,形成叠合模型,进行建筑物观测资料的分析。
6) prototype observation
原型观测
1.
Analysis on prototype observation on lifting power of spillway tunnel working gate for Tianqiao Hydropower Station;
天桥水电站泄洪洞工作闸门启闭力原型观测成果分析
2.
Summary of two times prototype observation results of roughness coefficient for water diversion tunnel from Luanhe River to Tianjin City;
引滦入津隧洞糙率两次原型观测成果综述
3.
Analysis on the prototype observation data of Wan anxi concrete face rockfill dam;
万安溪面板堆石坝原型观测资料分析
补充资料:地下建筑物原型观测
地下建筑物原型观测
prototype observation for underground structure
简单可靠的仪器设备进行变形和位移、应力和应变、渗透压力等项目的观测。地下建筑物原型观测始于20世纪30年代,中国始于60年代初,目前已在水利水电工程的地下洞室中较普遍地开展。 施工期观测亦称临时观测,其作用是:①安全监测,较早地提供围岩失稳的警报,以便及时采取补救措施。②提供第一性资料,减少在设计假定中的未确定因素,取得反馈信息作反分析用,校核原设计,并在必要时修改原设计。③保证施工技术措施能符合实际情况,既安全、又经济。总之,是利用施工期所提供的信息,反馈到设计和施工中去。60年代发展起来的隧洞施工的新奥法,施工期观测就是重要组成部分。 施工期观测的项目,一般有位移、应力(应变)、渗压和温度等项,有时观测项目随施工进展而变更。 (1)位移观测中常用的仪器有收敛计、多点位移计(伸长计)、钻孔倾斜仪、挠度计、测缝计和水准测量(如正倒锤)。 (2)应力观测的常用仪器为锚杆测力计、钢筋计和应变计。 (3)渗透压力观测的仪器有渗压计、压力计、测压管等。 (4)温度观测仪器为温度计。 对地下建筑物原型观测仪器的要求,原则上应性能稳定、使用简单可靠、节省人力,且尽可能地自动化、遥测化。 运行期观测亦称长期观测.其作用是:通过一些主要建筑部位的典型断面埋设的仪器,对地下建筑物的岩体和衬砌进行长期观测,以了解建筑物在运行过程中受力状态及周围环境条件(温度、地下水)的变化,以保证地下建筑物的安全运行,或在必要时采取补强措施。此类观测资料还可作为反分析的依据,以进一步检验原设计的正确性,为今后改进地下建筑物设计理论积累数据,供其他工程设计借鉴。 运行期观测的项目和所用仪器,基本上和施工期观测相同,只是在仪器性能的稳定性上要求更高些、应确保长期正常使用。 通常工程上对施工期观测与运行期观测的项目和仪器进行统一规划设计,使施工期埋设的仪器也留作运行期观测使用。 观测间隔时间施工期观测的历时较短,一般在洞室开挖或支护后的半个月内,每天应观测1~2次;当掌子面推进到距观测断面大于2倍洞室的跨度后,每2天观测1次;当变形稳定后,一般每月观测1一3次。运行期观测的历时较长,通常初期每日或隔日观测一次,随观测值变化减缓,逐步改为每周、每旬观测一次,最后可每月观测一次。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。