1) Water Supply Hinge Project (CWSHP)
供水枢纽工程
1.
The affecting area and quantity on soil erosion was calculated on the Chaozhou Water Supply Hinge Project (CWSHP).
针对《广东省潮州供水枢纽工程初步设计报告》中就不同土地利用类型区水土保持的设计方案,构建了土地损失指数、工程措施治理面积指数、生物措施治理面积指数和水土流失增加指数等指标组成的水土保持方案生态效益评价指标体系,在指标涵义明确的基础上实现了指标量化,并实际应用于潮州供水枢纽工程水土保持设计方案,结果显示构建的水土保持方案生态评价指标体系科学、可行,该工程的建设具有良好的社会、经济、生态综合效益。
2) Chaozhou Water Supply Control Project
潮州供水枢纽工程
1.
Foundation excavation and construction measures for powerhouse of Chaozhou Water Supply Control Project;
潮州供水枢纽工程厂房基坑开挖及措施
3) Water supply complex
供水枢纽
1.
This paper introduces the ascertaining the layout of ship sluice and operation for Chaozhou water supply complex, which all performance and dimension are satisfied the requirement of the relevant code.
通过本文设计,确定潮州供水枢纽船闸的船闸布置及行运方式,使船闸各部位的功能及尺寸满足船闸设计规范的要求。
4) water project
水利枢纽工程
1.
In order to estimate the impacts of water projects on ecological ca- pacity,the method by which resource output was regarded as the supply of ecological capacity was adopted based on analyzing the disadvantage of this model.
为评价水利枢纽工程对生态承载力的影响,在分析该模型缺点的基础上,采用了资源产出作为生态承载力供给的计算方法。
5) key project for water lifting
提水枢纽工程
补充资料:葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
葛洲坝水利枢纽二期工程的工地
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条