1) gyrating flow spillway tunnel
旋流泄洪洞
1.
Type selection of gyrating flow spillway tunnel in the right bank of the Gongboxia Hydropower Station;
公伯峡水电站右岸旋流泄洪洞的选型
2) vortex spillway tunnel
旋流消能泄洪洞
3) flood discharge tunnel with vertical vertex flow
竖井旋流泄洪洞
1.
In virtue of specific head and discharge of Gongboxia hydropower station,the diversion tunnel was studied to reconstruct into flood discharge tunnel with horizontal vertex flow or flood discharge tunnel with vertical vertex flow.
根据公伯峡水电站特定的水头和泄量,研究了公伯峡水电站导流洞改建成水平旋流泄洪洞和竖井旋流泄洪洞两种型式,并对选定的水平旋流泄洪洞进行了体型优化研究。
4) flood discharge tunnel with horizontal vertex flow
水平旋流泄洪洞
1.
In virtue of specific head and discharge of Gongboxia hydropower station,the diversion tunnel was studied to reconstruct into flood discharge tunnel with horizontal vertex flow or flood discharge tunnel with vertical vertex flow.
根据公伯峡水电站特定的水头和泄量,研究了公伯峡水电站导流洞改建成水平旋流泄洪洞和竖井旋流泄洪洞两种型式,并对选定的水平旋流泄洪洞进行了体型优化研究。
5) swirl tunnel with barrage
旋流阻塞复合式泄洪洞
补充资料:泄洪洞
见水工隧洞。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条