1)  constant temperature measures
恒温措施
2)  temperature control measure
温控措施
1.
Discussion on temperature control measures of massive concrete;
大体积水工混凝土温控措施探讨
2.
Concrete temperature control standards,allowable maximum temperature and joint grouting temperatures were set forth in the light of dam project features,and the temperature control measures and requirements are proposed such as mixer outlet temperature,placing temperature,lift thickness,interval period,co.
针对工程特点,确定了坝体混凝土温差控制标准、容许最高温度和厂坝接缝灌浆温度,提出了混凝土出机口温度、浇筑温度、浇筑层厚和间歇期、养护和保护、通水冷却等各个环节的温控措施和要求。
3.
On the basis of the optimal selection of raw materials of concrete,we formulated rational temperature control measures in summer and winter,which had gained good effectiveness.
通过对混凝土原材料的优选,制定了合理的夏季、冬季温控措施,并在施工中取得了良好的效果。
3)  temperature-controlling measures
控温措施
1.
The temperature-controlling measures of low temperature pit entry cover the followings: appropriate regulation of production time,use of high temperature starter,decrease of grinding degree of raw materials and caky start.
低温入窖的控温措施有合理调整生产时间、使用高温曲、降低原料和曲块的粉碎度、打高温量水、适当控制入窖淀粉含量、控制酸度和回酒发酵。
4)  temperature control measures
温控措施
1.
Consequently,the temperature control measures are adopted,such as rationalizing the construction sequence,optimizing the concrete mix proportion,controlling the concrete temperature when placing it to the working area,add.
为解决上述问题,利用三维有限元理论进行了施工仿真计算,提出了合理安排施工顺序、优化混凝土配合比、控制入仓温度、掺入聚丙烯腈纤维、增设温度钢筋、设置膨胀加强带等温控措施,消灭了结构的温度裂缝,效果良好。
2.
,aiming at the optimization of technology and economy,the paper studies systematically the feasibility of applying different temperature control measures in different seasons and at different elevations;and obtains charac.
利用数值仿真计算方法,在基本温控方案的基础上,进行了更细致的温控措施优化设计。
3.
The result show that the concrete mixed with MgO can obviously compensate for thermal stress of the foundation restraint section and it is the useful way to simple temperature control measures and reduce thermal s.
采用三维有限元仿真计算程序对某碾压混凝土围堰掺M gO和不掺M gO两种方案进行了计算和分析,探讨了大体积混凝土掺用M gO后的温度应力分布特点,结果表明掺M gO后对基础强约束区混凝土温度应力有明显的补偿作用,是简化温控措施和减少温度应力裂缝的有效途径。
5)  temperature control
温控措施
1.
Application of temperature control measures on high performance pumped-concrete to Ⅲ bid section of Caohe Aqueduct
高性能泵送混凝土温控措施在漕河渡槽Ⅲ标工程中的应用
2.
In the construction,the integral temperature control approaches,such as material pre-cooling technique,cold water-mixing,ice-mixing,sun proofing and outside lowering are used to prevent the pier from crack to ensure constructing quality.
根据闸墩的结构及边界条件,为了控制温度应力防止裂缝的产生,在施工过程中采取了骨料预冷、冷水拌和、掺冰屑拌和、仓面遮阳、内部通冷却水及外侧保温等综合温控措施,确保了闸墩混凝土的施工质量。
3.
Based on domestic advanced experiences,practical temperature control measures were taken to ensure the construction quality.
为了保证工程质量,在吸取国内先进经验的基础上,采用了切实可行的温控措施,如埋设冷却水管进行混凝土冷却等,取得了一定效果。
6)  increment temperature measures
增温措施
1.
Discussion on increment temperature measures in well irrigation area;
旱灌井灌区灌溉水增温措施初探
补充资料:不合格品纠正措施(见纠正措施)


不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions

bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。