1.
Analysis of the Simulation Sensitivity of Temperature Control Measures for Concrete Arch Dam
混凝土拱坝温控措施仿真敏感性分析
2.
Temperature Control Measure in Course of Constructing Mass Concrete Base Slab
大体积混凝土承台施工过程中的温控措施
3.
Temperature Control Measure of Concrete Construction of Liujia Daokou Regulating Sluice Project in Low-temperature Season;
刘家道口节制闸工程低温季节混凝土施工温控措施
4.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
5.
Analysis on Crack Cause of Massive Concrete and Measures of Temperature Control
大体积混凝土裂缝成因分析及温控措施
6.
Comparison of Second Stage Artificial Cooling Schemes in Xiaowan Arch Dam
小湾拱坝二期冷却方案温控措施对比分析
7.
Temperature Control Design for the Sluice-Gate Concrete and Measures to Control Its Use in Construction
水闸混凝土的温控设计与施工控制措施
8.
Optimization Design of Temperature Control Measures Used in Whole Dams
混凝土坝整体温度控制措施优化设计
9.
The Cause of Thermal Crack for Concrete Structure and Control Measures;
混凝土结构温度裂缝成因及控制措施
10.
The Control Measures of Temperature Crack in Bridge Mass Concrete
桥梁大体积混凝土温度裂缝控制措施
11.
The Construction Methods and Quality Control Measures of External Thermal Insulation System
外墙保温系统施工方法及质量控制措施
12.
Some Temperature Control Measures during the Construction of Gravity Dam for Guangzhao Hydropower Station
光照水电站碾压混凝土坝施工期温度控制措施
13.
Quality Control Measures in Beam Prefabrication under High Temperature
高温条件下梁体预制混凝土施工质量控制措施
14.
Research on the Measures of Thermostatic Control to Prevent cracking on the Large Scale Prestress Aqueduct During Construction Period
大型预应力渡槽施工期温控防裂措施研究
15.
Thermal Stress Simulation Analysis during Construction Period and Temperature Control Measures for Crack Prevention Studies on RCC Gravity Dam;
碾压混凝土重力坝施工期温度应力仿真及温控防裂措施研究
16.
The initiative adsorption of molecular-sieves is a method to control the low temperature deposition contamination.
主动吸附是控制低温沉积污染的措施之一。
17.
The Research Theory and Practice of the Temperature Control and Prevention Measures Against Crack in Water Engineering Concrete;
水工混凝土温控防裂措施研究的理论与实践
18.
Cost Estimate of Temperature Control for Hyperboloidal Arch Dam Construction;
混凝土双曲拱坝温度控制措施费用估算研究